Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2006 |
Principal Product | Converted paper, foil and film |
NAICS | 322220 - Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2672 - Paper Coated And Laminated, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 195 |
Plant Area (Sq.Ft.) | 261,000 |
Annual Production | 691,335 Pieces |
Production Hrs. Annual | 7,344 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $430,203 | 6,047,530 | kWh | $0.07 |
Electricity Demand | $79,155 | 13,364 | kW-months/year | $5.92 |
Electricity Fees | $3,432 | - | $ | - |
Natural Gas | $521,600 | 61,959 | MMBtu | $8.42 |
Fuel Oil #2 | $79,027 | 7,042 | MMBtu | $11.22 |
TOTAL ENERGY COSTS | $1,113,417 | |||
RECOMMENDED SAVINGS* | $197,508 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $37,536 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $79,413 Cost: $172,300 |
$(-7,946) | (-111,700) | $(-2,241) | (-348) | $89,600 | 9,583 |
$(-7,946) (-111,700) kWh |
$(-2,241) (-348) kW-months/year |
$89,600 9,583 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2212 USE MINIMUM SAFE OVEN VENTILATION |
Savings: $71,115 Cost: $115,075 |
$(-4,977) | (-69,800) | $(-784) | (-134) | $76,876 | 8,222 |
$(-4,977) (-69,800) kWh |
$(-784) (-134) kW-months/year |
$76,876 8,222 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $19,335 Cost: $96,992 |
$17,019 | 238,700 | $2,316 | 390 | - | - |
$17,019 238,700 kWh |
$2,316 390 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,691 Cost: $749 |
$7,622 | 106,900 | $1,069 | 180 | - | - |
$7,622 106,900 kWh |
$1,069 180 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $8,388 Cost: $4,050 |
- | - | - | - | $8,388 | 897 |
- - kWh |
- - kW-months/year |
$8,388 897 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $7,526 Cost: $8,755 |
$1,290 | 18,100 | - | - | $6,236 | 667 |
$1,290 18,100 kWh |
- - kW-months/year |
$6,236 667 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,918 Cost: $700 |
$1,518 | 21,300 | $400 | 34 | - | - |
$1,518 21,300 kWh |
$400 34 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,122 Cost: $950 |
- | - | - | - | $1,122 | 120 |
- - kWh |
- - kW-months/year |
$1,122 120 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $197,508 Cost: $399,571 |
$14,526 | 203,500 | $760 | 122 | $182,222 | 19,489 | $14,526 203,500 kWh |
$760 122 kW-months/year |
$182,222 19,489 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $37,536 Cost: $102,741 |
$24,641 | 345,600 | $3,385 | 570 | $9,510 | 1,017 | $24,641 345,600 kWh |
$3,385 570 kW-months/year |
$9,510 1,017 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |