IAC logo
IAC Assessment: MA0607
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0607
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2006
Principal Product Jet Engine Components
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $5,000,000-$10,000,000
# of Employees 1,500
Plant Area (Sq.Ft.) 968,000
Annual Production 105,000 Units
Production Hrs. Annual 8,590
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,935,943 52,122,000 kWh $0.06
Electricity Demand $652,022 95,781 kW-months/year $6.81
Electricity Fees $19,416 - $ -
Natural Gas $333,434 20,373 MMBtu $16.37
Fuel Oil #6 $822,981 101,093 MMBtu $8.14
TOTAL ENERGY COSTS $4,763,796
RECOMMENDED SAVINGS* $149,716 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$46,963
Cost:
-
$123,310 2,242,000 $12,133 1,228 - - $(-83,436) (-9,657) $(-5,044) - $123,310
2,242,000
kWh
$12,133
1,228
kW-months/year
-
-
MMBtu
$(-83,436)
(-9,657)
MMBtu
$(-5,044)
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$45,943
Cost:
$10,400
$7,205 131,000 $385 197 - - $38,353 4,439 - - $7,205
131,000
kWh
$385
197
kW-months/year
-
-
MMBtu
$38,353
4,439
MMBtu
-
-
$
03: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$14,261
Cost:
$5,500
$3,306 60,100 - - $42,958 2,977 $(-32,003) (-3,704) - - $3,306
60,100
kWh
-
-
kW-months/year
$42,958
2,977
MMBtu
$(-32,003)
(-3,704)
MMBtu
-
-
$
04: 2.7314 REDUCE VENTILATION AIR Savings:
$12,889
Cost:
$1,700
$594 10,800 - - - - $12,295 1,423 - - $594
10,800
kWh
-
-
kW-months/year
-
-
MMBtu
$12,295
1,423
MMBtu
-
-
$
05: 2.8122 USE UTILITY CONTROLLED POWER MANAGEMENT Savings:
$12,223
Cost:
$14,000
$333 600 $12,000 150 $(-101) (-7) - - $(-9) - $333
600
kWh
$12,000
150
kW-months/year
$(-101)
(-7)
MMBtu
-
-
MMBtu
$(-9)
-
$
06: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$10,577
Cost:
$1,870
$1,997 36,300 - - - - $8,580 993 - - $1,997
36,300
kWh
-
-
kW-months/year
-
-
MMBtu
$8,580
993
MMBtu
-
-
$
07: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$6,860
Cost:
$3,500
- - - - - - $6,860 794 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,860
794
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$149,716
Cost:
$36,970
$136,745 2,480,800 $24,518 1,575 $42,857 2,970 $(-49,351) (-5,712) $(-5,053) - $136,745
2,480,800
kWh
$24,518
1,575
kW-months/year
$42,857
2,970
MMBtu
$(-49,351)
(-5,712)
MMBtu
$(-5,053)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Fuel Oil #6 Ancillary Material Cost