IAC Assessment: MA0609
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0609
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2007
Principal Product Slit plastic and paper films, cable fillers, non-woven films
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3497 - Metal Foil And Leaf
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 52,200
Annual Production 1,250,000 Pounds
Production Hrs. Annual 6,240
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $333,043 3,816,964 kWh $0.09
Electricity Demand $79,378 8,417 kW-months/year $9.43
Natural Gas $31,199 2,399 MMBtu $13.01
TOTAL ENERGY COSTS $443,620
RECOMMENDED SAVINGS* $75,851 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$45,854
Cost:
$54,000
$50,787 513,000 $19,166 1,972 $(-24,099) (-2,058) $50,787
513,000
kWh
$19,166
1,972
kW-months/year
$(-24,099)
(-2,058)
MMBtu
02: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$11,356
Cost:
$40,000
$(-1,782) (-18,000) $(-340) (-35) $13,478 1,151 $(-1,782)
(-18,000)
kWh
$(-340)
(-35)
kW-months/year
$13,478
1,151
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,050
Cost:
$5,000
$1,960 19,800 $350 36 $2,740 234 $1,960
19,800
kWh
$350
36
kW-months/year
$2,740
234
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,398
Cost:
$19,100
$3,980 40,200 $418 43 - - $3,980
40,200
kWh
$418
43
kW-months/year
-
-
MMBtu
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$3,871
Cost:
$7,500
$3,871 39,100 - - - - $3,871
39,100
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,436
Cost:
$2,200
$901 9,100 $535 56 - - $901
9,100
kWh
$535
56
kW-months/year
-
-
MMBtu
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,227
Cost:
$3,200
$(-257) (-2,600) $(-38) (-4) $1,522 130 $(-257)
(-2,600)
kWh
$(-38)
(-4)
kW-months/year
$1,522
130
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,158
Cost:
$300
$1,158 11,700 - - - - $1,158
11,700
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$849
Cost:
$600
$713 7,200 $136 14 - - $713
7,200
kWh
$136
14
kW-months/year
-
-
MMBtu
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$652
Cost:
-
$545 5,500 $107 11 - - $545
5,500
kWh
$107
11
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$75,851
Cost:
$131,900
$61,876 625,000 $20,334 2,093 $(-6,359) (-543) $61,876
625,000
kWh
$20,334
2,093
kW-months/year
$(-6,359)
(-543)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas