IAC logo
IAC Assessment: MA0612
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0612
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2007
Principal Product Tape heads and MEMS
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3572 - Computer Storage Devices
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 208,000
Annual Production 3,640 Pieces
Production Hrs. Annual 4,290
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $863,394 12,985,347 kWh $0.07
Electricity Demand $95,631 23,044 kW-months/year $4.15
Electricity Fees $1,502 - $ -
Natural Gas $402,972 26,894 MMBtu $14.98
TOTAL ENERGY COSTS $1,363,499
RECOMMENDED SAVINGS* $268,537 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$96,635
Cost:
$175,500
$75,576 1,072,000 - - $21,059 1,482 $75,576
1,072,000
kWh
-
-
kW-months/year
$21,059
1,482
MMBtu
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$57,921
Cost:
$108,000
$53,601 760,300 $4,320 1,041 - - $53,601
760,300
kWh
$4,320
1,041
kW-months/year
-
-
MMBtu
03: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$23,433
Cost:
$12,750
$21,686 307,600 $1,747 421 - - $21,686
307,600
kWh
$1,747
421
kW-months/year
-
-
MMBtu
04: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$21,000
Cost:
$73,760
$(-4,300) (-61,000) - - $25,300 1,782 $(-4,300)
(-61,000)
kWh
-
-
kW-months/year
$25,300
1,782
MMBtu
05: 2.7314 REDUCE VENTILATION AIR Savings:
$17,480
Cost:
$8,040
$3,440 48,737 - - $14,040 988 $3,440
48,737
kWh
-
-
kW-months/year
$14,040
988
MMBtu
06: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$16,924
Cost:
$3,200
- - - - $16,924 1,191 -
-
kWh
-
-
kW-months/year
$16,924
1,191
MMBtu
07: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$14,963
Cost:
$26,370
- - - - $14,963 1,053 -
-
kWh
-
-
kW-months/year
$14,963
1,053
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,240
Cost:
$11,700
$6,240 88,476 - - - - $6,240
88,476
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,610
Cost:
$18,700
$4,410 62,600 $1,200 289 - - $4,410
62,600
kWh
$1,200
289
kW-months/year
-
-
MMBtu
10: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$5,532
Cost:
$8,000
$4,752 67,000 $780 188 - - $4,752
67,000
kWh
$780
188
kW-months/year
-
-
MMBtu
11: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,799
Cost:
$1,800
$2,590 36,800 $209 50 - - $2,590
36,800
kWh
$209
50
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$268,537
Cost:
$447,820
$167,995 2,382,513 $8,256 1,989 $92,286 6,496 $167,995
2,382,513
kWh
$8,256
1,989
kW-months/year
$92,286
6,496
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas