IAC logo
IAC Assessment: MA0616
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0616
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2007
Principal Product Automotive timing chains
NAICS 333613 - Mechanical Power Transmission Equipment Manufacturing
SIC 3568 - Power Transmission Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 195
Plant Area (Sq.Ft.) 230,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 7,488
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $534,502 8,764,800 kWh $0.06
Electricity Demand $124,164 18,766 kW-months/year $6.62
Natural Gas $102,828 8,823 MMBtu $11.65
LPG $84,537 6,159 MMBtu $13.73
TOTAL ENERGY COSTS $846,031
RECOMMENDED SAVINGS* $87,872 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,603
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,636
Cost:
$132,834
$19,183 231,117 $2,453 370 - - $19,183
231,117
kWh
$2,453
370
kW-months/year
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,128
Cost:
$3,725
$5,438 64,742 $690 104 - - $5,438
64,742
kWh
$690
104
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,603
Cost:
$2,550
$4,973 59,200 $630 95 - - $4,973
59,200
kWh
$630
95
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$37,450
Cost:
$12,998
- - - - $37,450 2,345 -
-
kWh
-
-
kW-months/year
$37,450
2,345
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$16,346
Cost:
$1,088
$2,484 29,573 - - $13,862 868 $2,484
29,573
kWh
-
-
kW-months/year
$13,862
868
MMBtu
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$709
Cost:
$300
$629 7,488 $80 12 - - $629
7,488
kWh
$80
12
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$87,872
Cost:
$153,495
$32,707 392,120 $3,853 581 $51,312 3,213 $32,707
392,120
kWh
$3,853
581
kW-months/year
$51,312
3,213
MMBtu
TOTAL IMPLEMENTED Savings:
$5,603
Cost:
$2,550
$4,973 59,200 $630 95 - - $4,973
59,200
kWh
$630
95
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas