IAC logo
IAC Assessment: MA0627
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0627
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2008
Principal Product Ceramic chip capacitors
NAICS 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675 - Electronic Capacitors
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 91,235
Annual Production 100,000 Pieces
Production Hrs. Annual 6,240
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $712,241 7,367,815 kWh $0.10
Electricity Demand $145,813 13,867 kW-months/year $10.52
LPG $87,857 5,843 MMBtu $15.04
TOTAL ENERGY COSTS $945,911
RECOMMENDED SAVINGS* $77,369 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,047
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$52,302
Cost:
$35,000
$52,302 523,022 - - - - $52,302
523,022
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7314 REDUCE VENTILATION AIR Savings:
$8,813
Cost:
$16,000
$8,813 88,132 - - - - $8,813
88,132
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,984
Cost:
$8,550
- - $6,984 735 - - -
-
kWh
$6,984
735
kW-months/year
-
-
MMBtu
04: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$6,674
Cost:
$5,000
$6,674 66,743 - - - - $6,674
66,743
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$1,648
Cost:
$4,300
$1,648 16,482 - - - - $1,648
16,482
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$948
Cost:
$1,000
- - - - $948 63 -
-
kWh
-
-
kW-months/year
$948
63
MMBtu
TOTAL RECOMMENDED Savings:
$77,369
Cost:
$69,850
$69,437 694,379 $6,984 735 $948 63 $69,437
694,379
kWh
$6,984
735
kW-months/year
$948
63
MMBtu
TOTAL IMPLEMENTED Savings:
$69,047
Cost:
$60,550
$61,115 611,154 $6,984 735 $948 63 $61,115
611,154
kWh
$6,984
735
kW-months/year
$948
63
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG