IAC Assessment: MA0637
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0637
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2008
Principal Product Paper pulp
NAICS 322110 - Pulp Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 100,000
Annual Production 8,500 Tons
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,946,830 15,284,586 kWh $0.13
Natural Gas $696,763 62,547 MMBtu $11.14
Fuel Oil #6 $626,048 74,176 MMBtu $8.44
TOTAL ENERGY COSTS $3,269,641
RECOMMENDED SAVINGS* $776,053 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $204,551
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes
$ kWh $ MMBtu $ $
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$254,315
Cost:
$250,000
- - $254,315 22,829 - - -
-
kWh
$254,315
22,829
MMBtu
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$180,534
Cost:
$80,000
- - $180,534 16,206 - - -
-
kWh
$180,534
16,206
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$169,795
Cost:
$80,000
- - $169,795 15,242 - - -
-
kWh
$169,795
15,242
MMBtu
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$58,079
Cost:
$54,000
$58,079 446,760 - - - - $58,079
446,760
kWh
-
-
MMBtu
-
-
$
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$29,950
Cost:
$27,000
$29,950 230,388 - - - - $29,950
230,388
kWh
-
-
MMBtu
-
-
$
06: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$24,017
Cost:
$14,000
$24,440 188,000 - - $(-423) - $24,440
188,000
kWh
-
-
MMBtu
$(-423)
-
$
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$20,954
Cost:
$41,000
$20,954 161,184 - - - - $20,954
161,184
kWh
-
-
MMBtu
-
-
$
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$18,443
Cost:
$16,000
$18,443 141,868 - - - - $18,443
141,868
kWh
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,892
Cost:
$15,000
$8,892 68,400 - - - - $8,892
68,400
kWh
-
-
MMBtu
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,680
Cost:
$20,000
$6,680 51,382 - - - - $6,680
51,382
kWh
-
-
MMBtu
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,939
Cost:
$10,400
$3,939 30,300 - - - - $3,939
30,300
kWh
-
-
MMBtu
-
-
$
12: 2.5124 USE GRAVITY FEEDS WHEREVER POSSIBLE Savings:
$455
Cost:
$500
$455 3,504 - - - - $455
3,504
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$776,053
Cost:
$607,900
$171,832 1,321,786 $604,644 54,277 $(-423) - $171,832
1,321,786
kWh
$604,644
54,277
MMBtu
$(-423)
-
$
TOTAL IMPLEMENTED Savings:
$204,551
Cost:
$94,000
$24,440 188,000 $180,534 16,206 $(-423) - $24,440
188,000
kWh
$180,534
16,206
MMBtu
$(-423)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Personnel Changes Electricity Usage Natural Gas Personnel Changes