Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2008 |
Principal Product | Paper pulp |
NAICS | 322110 - Pulp Mills |
SIC | 2621 - Paper Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 8,500 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,946,830 | 15,284,586 | kWh | $0.13 |
Natural Gas | $696,763 | 62,547 | MMBtu | $11.14 |
Fuel Oil #6 | $626,048 | 74,176 | MMBtu | $8.44 |
TOTAL ENERGY COSTS | $3,269,641 | |||
RECOMMENDED SAVINGS* | $776,053 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $204,551 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $254,315 Cost: $250,000 |
- | - | $254,315 | 22,829 | - | - |
- - kWh |
$254,315 22,829 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $180,534 Cost: $80,000 |
- | - | $180,534 | 16,206 | - | - |
- - kWh |
$180,534 16,206 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $169,795 Cost: $80,000 |
- | - | $169,795 | 15,242 | - | - |
- - kWh |
$169,795 15,242 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $58,079 Cost: $54,000 |
$58,079 | 446,760 | - | - | - | - |
$58,079 446,760 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $29,950 Cost: $27,000 |
$29,950 | 230,388 | - | - | - | - |
$29,950 230,388 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR |
Savings: $24,017 Cost: $14,000 |
$24,440 | 188,000 | - | - | $(-423) | - |
$24,440 188,000 kWh |
- - MMBtu |
$(-423) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $20,954 Cost: $41,000 |
$20,954 | 161,184 | - | - | - | - |
$20,954 161,184 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $18,443 Cost: $16,000 |
$18,443 | 141,868 | - | - | - | - |
$18,443 141,868 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,892 Cost: $15,000 |
$8,892 | 68,400 | - | - | - | - |
$8,892 68,400 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $6,680 Cost: $20,000 |
$6,680 | 51,382 | - | - | - | - |
$6,680 51,382 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,939 Cost: $10,400 |
$3,939 | 30,300 | - | - | - | - |
$3,939 30,300 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.5124 USE GRAVITY FEEDS WHEREVER POSSIBLE |
Savings: $455 Cost: $500 |
$455 | 3,504 | - | - | - | - |
$455 3,504 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $776,053 Cost: $607,900 |
$171,832 | 1,321,786 | $604,644 | 54,277 | $(-423) | - | $171,832 1,321,786 kWh |
$604,644 54,277 MMBtu |
$(-423) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $204,551 Cost: $94,000 |
$24,440 | 188,000 | $180,534 | 16,206 | $(-423) | - | $24,440 188,000 kWh |
$180,534 16,206 MMBtu |
$(-423) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Electricity Usage | Natural Gas | Personnel Changes |