IAC logo
IAC Assessment: MA0639
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0639
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2008
Principal Product Industrial filtration systems
NAICS 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 265
Plant Area (Sq.Ft.) 291,450
Annual Production 8,700 Thousand Feet
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $740,214 9,717,540 kWh $0.08
Electricity Demand $161,182 23,396 kW-months/year $6.89
Electricity Fees $4,438 - $ -
Natural Gas $427,606 29,202 MMBtu $14.64
TOTAL ENERGY COSTS $1,333,440
RECOMMENDED SAVINGS* $181,621 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,448
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$78,761
Cost:
$65,000
$26,832 357,766 - - $51,929 3,547 $26,832
357,766
kWh
-
-
kW-months/year
$51,929
3,547
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$31,993
Cost:
$70,840
$26,745 356,603 $5,248 686 - - $26,745
356,603
kWh
$5,248
686
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,064
Cost:
$17,800
$19,064 235,992 - - - - $19,064
235,992
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7314 REDUCE VENTILATION AIR Savings:
$16,180
Cost:
-
$3,297 43,964 - - $12,883 880 $3,297
43,964
kWh
-
-
kW-months/year
$12,883
880
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,735
Cost:
$15,500
$647 8,620 - - $13,088 894 $647
8,620
kWh
-
-
kW-months/year
$13,088
894
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$12,707
Cost:
$975
- - - - $12,707 868 -
-
kWh
-
-
kW-months/year
$12,707
868
MMBtu
07: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$7,426
Cost:
$27,000
$6,210 82,796 $1,216 159 - - $6,210
82,796
kWh
$1,216
159
kW-months/year
-
-
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$717
Cost:
$1,000
- - - - $717 49 -
-
kWh
-
-
kW-months/year
$717
49
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$716
Cost:
-
$601 8,018 $115 158 - - $601
8,018
kWh
$115
158
kW-months/year
-
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$322
Cost:
$2,000
$322 4,288 - - - - $322
4,288
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$181,621
Cost:
$200,115
$83,718 1,098,047 $6,579 1,003 $91,324 6,238 $83,718
1,098,047
kWh
$6,579
1,003
kW-months/year
$91,324
6,238
MMBtu
TOTAL IMPLEMENTED Savings:
$52,448
Cost:
$100,815
$33,277 443,687 $6,464 845 $12,707 868 $33,277
443,687
kWh
$6,464
845
kW-months/year
$12,707
868
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas