Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2008 |
Principal Product | Industrial filtration systems |
NAICS | 333999 - All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3559 - Special Industry Machinery, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 265 |
Plant Area (Sq.Ft.) | 291,450 |
Annual Production | 8,700 Thousand Feet |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $740,214 | 9,717,540 | kWh | $0.08 |
Electricity Demand | $161,182 | 23,396 | kW-months/year | $6.89 |
Electricity Fees | $4,438 | - | $ | - |
Natural Gas | $427,606 | 29,202 | MMBtu | $14.64 |
TOTAL ENERGY COSTS | $1,333,440 | |||
RECOMMENDED SAVINGS* | $181,621 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $52,448 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $78,761 Cost: $65,000 |
$26,832 | 357,766 | - | - | $51,929 | 3,547 |
$26,832 357,766 kWh |
- - kW-months/year |
$51,929 3,547 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $31,993 Cost: $70,840 |
$26,745 | 356,603 | $5,248 | 686 | - | - |
$26,745 356,603 kWh |
$5,248 686 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $19,064 Cost: $17,800 |
$19,064 | 235,992 | - | - | - | - |
$19,064 235,992 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7314 REDUCE VENTILATION AIR |
Savings: $16,180 Cost: - |
$3,297 | 43,964 | - | - | $12,883 | 880 |
$3,297 43,964 kWh |
- - kW-months/year |
$12,883 880 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $13,735 Cost: $15,500 |
$647 | 8,620 | - | - | $13,088 | 894 |
$647 8,620 kWh |
- - kW-months/year |
$13,088 894 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $12,707 Cost: $975 |
- | - | - | - | $12,707 | 868 |
- - kWh |
- - kW-months/year |
$12,707 868 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $7,426 Cost: $27,000 |
$6,210 | 82,796 | $1,216 | 159 | - | - |
$6,210 82,796 kWh |
$1,216 159 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $717 Cost: $1,000 |
- | - | - | - | $717 | 49 |
- - kWh |
- - kW-months/year |
$717 49 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $716 Cost: - |
$601 | 8,018 | $115 | 158 | - | - |
$601 8,018 kWh |
$115 158 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $322 Cost: $2,000 |
$322 | 4,288 | - | - | - | - |
$322 4,288 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $181,621 Cost: $200,115 |
$83,718 | 1,098,047 | $6,579 | 1,003 | $91,324 | 6,238 | $83,718 1,098,047 kWh |
$6,579 1,003 kW-months/year |
$91,324 6,238 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $52,448 Cost: $100,815 |
$33,277 | 443,687 | $6,464 | 845 | $12,707 | 868 | $33,277 443,687 kWh |
$6,464 845 kW-months/year |
$12,707 868 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |