IAC Assessment: MA0640
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0640
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2008
Principal Product Semiconductors
NAICS 334413 - Semiconductor and Related Device Manufacturing
SIC 3674 - Semiconductors And Related Devices
Sales $50,000,000-$100,000,000
# of Employees 437
Plant Area (Sq.Ft.) 160,000
Annual Production 100,000,000 Pieces
Production Hrs. Annual 5,228
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,725,540 13,025,400 kWh $0.13
Electricity Demand $178,335 29,430 kW-months/year $6.06
Electricity Fees $840 - $ -
Natural Gas $222,698 18,335 MMBtu $12.15
TOTAL ENERGY COSTS $2,127,413
RECOMMENDED SAVINGS* $67,869 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,019
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7314 REDUCE VENTILATION AIR Savings:
$36,692
Cost:
$39,000
$25,587 198,015 - - $11,105 914 - - $25,587
198,015
kWh
-
-
kW-months/year
$11,105
914
MMBtu
-
-
Tgal
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,811
Cost:
$11,850
- - $11,811 1,755 - - - - -
-
kWh
$11,811
1,755
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$11,640
Cost:
$43,000
$11,640 87,842 - - - - - - $11,640
87,842
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 3.4151 MINIMIZE WATER USAGE Savings:
$4,210
Cost:
$18,000
- - - - - - $4,210 630,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,210
630,000
Tgal
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,895
Cost:
$3,000
- - - - $1,895 156 - - -
-
kWh
-
-
kW-months/year
$1,895
156
MMBtu
-
-
Tgal
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$977
Cost:
-
$876 6,610 $101 15 - - - - $876
6,610
kWh
$101
15
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$644
Cost:
$689
- - - - $644 53 - - -
-
kWh
-
-
kW-months/year
$644
53
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$67,869
Cost:
$115,539
$38,103 292,467 $11,912 1,770 $13,644 1,123 $4,210 630,000 $38,103
292,467
kWh
$11,912
1,770
kW-months/year
$13,644
1,123
MMBtu
$4,210
630,000
Tgal
TOTAL IMPLEMENTED Savings:
$52,019
Cost:
$54,539
$26,463 204,625 $11,912 1,770 $13,644 1,123 - - $26,463
204,625
kWh
$11,912
1,770
kW-months/year
$13,644
1,123
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal