IAC logo
IAC Assessment: MA0642
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0642
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2008
Principal Product Paper mill roll covers
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 50,000
Annual Production 500 Pieces
Production Hrs. Annual 4,160
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $140,318 1,263,600 kWh $0.11
Electricity Demand $40,090 5,053 kW-months/year $7.93
Electricity Fees $1,308 - $ -
Natural Gas $108,397 9,026 MMBtu $12.01
TOTAL ENERGY COSTS $290,113
RECOMMENDED SAVINGS* $24,539 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,530
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,279
Cost:
$27,924
$10,996 99,770 $2,283 288 - - $10,996
99,770
kWh
$2,283
288
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,095
Cost:
$4,354
- - - - $4,095 314 -
-
kWh
-
-
kW-months/year
$4,095
314
MMBtu
03: 2.7314 REDUCE VENTILATION AIR Savings:
$3,315
Cost:
$1,000
- - - - $3,315 276 -
-
kWh
-
-
kW-months/year
$3,315
276
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,935
Cost:
$6,500
- - $1,935 244 - - -
-
kWh
$1,935
244
kW-months/year
-
-
MMBtu
05: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$1,273
Cost:
$5,500
- - - - $1,273 106 -
-
kWh
-
-
kW-months/year
$1,273
106
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$391
Cost:
$900
$391 3,554 - - - - $391
3,554
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$251
Cost:
$120
$251 2,279 - - - - $251
2,279
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$24,539
Cost:
$46,298
$11,638 105,603 $4,218 532 $8,683 696 $11,638
105,603
kWh
$4,218
532
kW-months/year
$8,683
696
MMBtu
TOTAL IMPLEMENTED Savings:
$13,530
Cost:
$28,044
$11,247 102,049 $2,283 288 - - $11,247
102,049
kWh
$2,283
288
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas