IAC Assessment: MA0651
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0651
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2009
Principal Product Electrical fittings
NAICS 332216 - Saw Blade and Handtool Manufacturing
SIC 3644 - Noncurrent-carrying Wiring Devices
Sales $50,000,000-$100,000,000
# of Employees 207
Plant Area (Sq.Ft.) 140,000
Annual Production 3,000 Tons
Production Hrs. Annual 4,160
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $731,218 5,222,988 kWh $0.14
Electricity Demand $105,398 23,466 kW-months/year $4.49
Electricity Fees $2,976 - $ -
Natural Gas $504,864 36,757 MMBtu $13.74
Fuel Oil #2 $40,024 3,480 MMBtu $11.50
TOTAL ENERGY COSTS $1,384,480
RECOMMENDED SAVINGS* $57,873 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,420
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7314 REDUCE VENTILATION AIR Savings:
$18,774
Cost:
$1,000
$5,424 40,030 - - $13,350 976 $5,424
40,030
kWh
-
-
kW-months/year
$13,350
976
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,340
Cost:
$96,800
$11,340 83,689 - - - - $11,340
83,689
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.1224 REPLACE BOILER Savings:
$10,080
Cost:
$30,700
- - - - $10,080 737 -
-
kWh
-
-
kW-months/year
$10,080
737
MMBtu
04: 2.2514 COVER OPEN TANKS Savings:
$10,013
Cost:
$5,866
- - - - $10,013 732 -
-
kWh
-
-
kW-months/year
$10,013
732
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,941
Cost:
$3,219
- - - - $2,941 215 -
-
kWh
-
-
kW-months/year
$2,941
215
MMBtu
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,725
Cost:
$18,300
$2,885 21,294 $670 140 $1,170 (-86) $2,885
21,294
kWh
$670
140
kW-months/year
$1,170
(-86)
MMBtu
TOTAL RECOMMENDED Savings:
$57,873
Cost:
$155,885
$19,649 145,013 $670 140 $37,554 2,574 $19,649
145,013
kWh
$670
140
kW-months/year
$37,554
2,574
MMBtu
TOTAL IMPLEMENTED Savings:
$21,420
Cost:
$127,500
$11,340 83,689 - - $10,080 737 $11,340
83,689
kWh
-
-
kW-months/year
$10,080
737
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas