IAC Assessment: MA0656
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0656
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2010
Principal Product Aerospace components
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 110,000
Annual Production 3,000 Pieces
Production Hrs. Annual 4,992
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $435,538 3,282,707 kWh $0.13
Electricity Demand $134,920 13,770 kW-months/year $9.80
Electricity Fees $9,828 - $ -
Fuel Oil #4 $178,067 12,365 MMBtu $14.40
TOTAL ENERGY COSTS $758,353
RECOMMENDED SAVINGS* $181,361 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $129,619
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #4 Electricity Usage Electricity Demand Natural Gas Fuel Oil #4
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$33,238
Cost:
$900
$33,238 231,782 - - - - - - $33,238
231,782
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$32,273
Cost:
$19,075
$27,685 193,065 $4,588 464 - - - - $27,685
193,065
kWh
$4,588
464
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,578
Cost:
$2,400
- - - - - - $2,578 179 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,578
179
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$16,891
Cost:
$15,755
- - - - - - $16,891 1,173 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$16,891
1,173
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,718
Cost:
$3,915
$3,718 25,925 - - - - - - $3,718
25,925
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$36,936
Cost:
$68,200
$36,936 257,573 - - - - - - $36,936
257,573
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$54,013
Cost:
$100,000
- - - - $(-124,045) (-13,231) $178,058 12,365 -
-
kWh
-
-
kW-months/year
$(-124,045)
(-13,231)
MMBtu
$178,058
12,365
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,714
Cost:
$3,865
$1,714 11,950 - - - - - - $1,714
11,950
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$181,361
Cost:
$214,110
$103,291 720,295 $4,588 464 $(-124,045) (-13,231) $197,527 13,717 $103,291
720,295
kWh
$4,588
464
kW-months/year
$(-124,045)
(-13,231)
MMBtu
$197,527
13,717
MMBtu
TOTAL IMPLEMENTED Savings:
$129,619
Cost:
$176,880
$75,606 527,230 - - $(-124,045) (-13,231) $178,058 12,365 $75,606
527,230
kWh
-
-
kW-months/year
$(-124,045)
(-13,231)
MMBtu
$178,058
12,365
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Fuel Oil #4 Electricity Usage Electricity Demand Natural Gas Fuel Oil #4