Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2010 |
Principal Product | Aerospace components |
NAICS | 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728 - Aircraft Parts And Equipment, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 150 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 3,000 Pieces |
Production Hrs. Annual | 4,992 |
Location (State) | CT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $435,538 | 3,282,707 | kWh | $0.13 |
Electricity Demand | $134,920 | 13,770 | kW-months/year | $9.80 |
Electricity Fees | $9,828 | - | $ | - |
Fuel Oil #4 | $178,067 | 12,365 | MMBtu | $14.40 |
TOTAL ENERGY COSTS | $758,353 | |||
RECOMMENDED SAVINGS* | $181,361 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $129,619 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #4 | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $33,238 Cost: $900 |
$33,238 | 231,782 | - | - | - | - | - | - |
$33,238 231,782 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $32,273 Cost: $19,075 |
$27,685 | 193,065 | $4,588 | 464 | - | - | - | - |
$27,685 193,065 kWh |
$4,588 464 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $2,578 Cost: $2,400 |
- | - | - | - | - | - | $2,578 | 179 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$2,578 179 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $16,891 Cost: $15,755 |
- | - | - | - | - | - | $16,891 | 1,173 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$16,891 1,173 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,718 Cost: $3,915 |
$3,718 | 25,925 | - | - | - | - | - | - |
$3,718 25,925 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $36,936 Cost: $68,200 |
$36,936 | 257,573 | - | - | - | - | - | - |
$36,936 257,573 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $54,013 Cost: $100,000 |
- | - | - | - | $(-124,045) | (-13,231) | $178,058 | 12,365 |
- - kWh |
- - kW-months/year |
$(-124,045) (-13,231) MMBtu |
$178,058 12,365 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,714 Cost: $3,865 |
$1,714 | 11,950 | - | - | - | - | - | - |
$1,714 11,950 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $181,361 Cost: $214,110 |
$103,291 | 720,295 | $4,588 | 464 | $(-124,045) | (-13,231) | $197,527 | 13,717 | $103,291 720,295 kWh |
$4,588 464 kW-months/year |
$(-124,045) (-13,231) MMBtu |
$197,527 13,717 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $129,619 Cost: $176,880 |
$75,606 | 527,230 | - | - | $(-124,045) | (-13,231) | $178,058 | 12,365 | $75,606 527,230 kWh |
- - kW-months/year |
$(-124,045) (-13,231) MMBtu |
$178,058 12,365 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #4 | Electricity Usage | Electricity Demand | Natural Gas | Fuel Oil #4 |