Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2010
Principal Product Silicon Carbide
NAICS 333314 - Optical Instrument and Lens Manufacturing
SIC 3827 - Optical Instruments And Lenses
Sales $10,000,000-$50,000,000
# of Employees 30
Plant Area (Sq.Ft.) 80,000
Annual Production 12 Pieces
Production Hrs. Annual 4,160
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $420,845 3,399,800 kWh $0.12
Electricity Demand $56,349 13,913 kW-months/year $4.05
Electricity Fees $26,140 - $ -
Natural Gas $3,831 227 MMBtu $16.85
TOTAL ENERGY COSTS $507,165
RECOMMENDED SAVINGS* $103,955 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $87,113
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,403
Cost:
$9,546
$5,403 43,646 - - $5,403
43,646
kWh
-
-
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,241
Cost:
-
$2,241 18,108 - - $2,241
18,108
kWh
-
-
kW-months/year
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$58,587
Cost:
-
$58,587 473,240 - - $58,587
473,240
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,601
Cost:
$19,240
$13,973 112,871 $628 155 $13,973
112,871
kWh
$628
155
kW-months/year
05: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE Savings:
$23,123
Cost:
-
$23,123 186,775 - - $23,123
186,775
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$103,955
Cost:
$28,786
$103,327 834,640 $628 155 $103,327
834,640
kWh
$628
155
kW-months/year
TOTAL IMPLEMENTED Savings:
$87,113
Cost:
$9,546
$87,113 703,661 - - $87,113
703,661
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand