Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2010
Principal Product Silicone Carrbide
NAICS 333314 - Optical Instrument and Lens Manufacturing
SIC 3827 - Optical Instruments And Lenses
Sales $10,000,000-$50,000,000
# of Employees 69
Plant Area (Sq.Ft.) 56,000
Annual Production 12 Pieces
Production Hrs. Annual 3,640
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $233,699 1,872,000 kWh $0.12
Electricity Demand $15,524 3,833 kW-months/year $4.05
Natural Gas $30,466 1,967 MMBtu $15.49
TOTAL ENERGY COSTS $279,689
RECOMMENDED SAVINGS* $36,176 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,346
#|Description Savings
Cost
Status Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$562
Cost:
$588
$562 3,903 - - - - $562
3,903
kWh
-
-
MMBtu
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$830
Cost:
$200
$830 6,650 - - - - $830
6,650
kWh
-
-
MMBtu
-
-
$
03: 2.7314 REDUCE VENTILATION AIR Savings:
$31,319
Cost:
$17,008
$19,812 134,263 $11,507 743 - - $19,812
134,263
kWh
$11,507
743
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$707
Cost:
$110
$707 5,668 - - - - $707
5,668
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$232
Cost:
$260
$232 1,863 - - - - $232
1,863
kWh
-
-
MMBtu
-
-
$
06: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$2,526
Cost:
$11,040
$(-1,474) (-11,813) - - $4,000 - $(-1,474)
(-11,813)
kWh
-
-
MMBtu
$4,000
-
$
TOTAL RECOMMENDED Savings:
$36,176
Cost:
$29,206
$20,669 140,534 $11,507 743 $4,000 - $20,669
140,534
kWh
$11,507
743
MMBtu
$4,000
-
$
TOTAL IMPLEMENTED Savings:
$35,346
Cost:
$29,006
$19,839 133,884 $11,507 743 $4,000 - $19,839
133,884
kWh
$11,507
743
MMBtu
$4,000
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Primary Product Electricity Usage Natural Gas Primary Product