IAC logo
IAC Assessment: MA0675
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0675
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2011
Principal Product Specialty paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 125,000
Annual Production 29,200 Tons
Production Hrs. Annual 8,590
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,789,361 21,390,000 kWh $0.08
Electricity Demand $563,175 48,036 kW-months/year $11.72
Electricity Fees $32,000 - $ -
Fuel Oil #6 $2,718,521 203,432 MMBtu $13.36
TOTAL ENERGY COSTS $5,103,057
RECOMMENDED SAVINGS* $62,390 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,590
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Electricity Usage Fuel Oil #6
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,359
Cost:
$42,800
$22,359 235,360 - - $22,359
235,360
kWh
-
-
MMBtu
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$13,761
Cost:
$66,000
$13,761 144,849 - - $13,761
144,849
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,132
Cost:
$23,800
$7,132 75,073 - - $7,132
75,073
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,736
Cost:
$23,800
$5,736 60,376 - - $5,736
60,376
kWh
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,422
Cost:
$23,800
$5,422 57,069 - - $5,422
57,069
kWh
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,677
Cost:
$12,300
$3,677 38,706 - - $3,677
38,706
kWh
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,590
Cost:
$950
- - $2,590 151 -
-
kWh
$2,590
151
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,713
Cost:
$6,600
$1,713 18,301 - - $1,713
18,301
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$62,390
Cost:
$200,050
$59,800 629,734 $2,590 151 $59,800
629,734
kWh
$2,590
151
MMBtu
TOTAL IMPLEMENTED Savings:
$2,590
Cost:
$950
- - $2,590 151 -
-
kWh
$2,590
151
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #6 Electricity Usage Fuel Oil #6