Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2011 |
Principal Product | cuttlery |
NAICS | 332215 - Metal Kitchen Cookware, Utensil, Cutlery, and Flatware (except Precious) Manufacturing |
SIC | 3421 - Cutlery |
Sales | $10,000,000-$50,000,000 |
# of Employees | 246 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 4,000,000 Pieces |
Production Hrs. Annual | 3,640 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $335,704 | 3,102,760 | kWh | $0.11 |
Electricity Demand | $123,324 | 13,348 | kW-months/year | $9.24 |
Natural Gas | $165,874 | 15,540 | MMBtu | $10.67 |
TOTAL ENERGY COSTS | $624,902 | |||
RECOMMENDED SAVINGS* | $17,221 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,256 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Electricity Usage | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $9,048 Cost: $2,585 |
$1,918 | 17,766 | $7,130 | 668 |
$1,918 17,766 kWh |
$7,130 668 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS |
Savings: $4,053 Cost: $200 |
$4,053 | 37,526 | - | - |
$4,053 37,526 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,514 Cost: $5,967 |
$426 | 3,950 | $1,088 | 102 |
$426 3,950 kWh |
$1,088 102 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,225 Cost: $200 |
$1,225 | 11,347 | - | - |
$1,225 11,347 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $912 Cost: $8,300 |
$912 | 8,451 | - | - |
$912 8,451 kWh |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $362 Cost: $500 |
- | - | $362 | 34 |
- - kWh |
$362 34 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $107 Cost: $100 |
- | - | $107 | 10 |
- - kWh |
$107 10 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,221 Cost: $17,852 |
$8,534 | 79,040 | $8,687 | 814 | $8,534 79,040 kWh |
$8,687 814 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,256 Cost: $9,352 |
$3,569 | 33,063 | $8,687 | 814 | $3,569 33,063 kWh |
$8,687 814 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Electricity Usage | Natural Gas |