IAC Assessment: MA0678
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0678
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2011
Principal Product Steel Investment castings
NAICS 331512 - Steel Investment Foundries
SIC 3324 - Steel Investment Foundries
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 110,000
Annual Production 15,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $972,900 9,002,755 kWh $0.11
Electricity Demand $177,973 22,560 kW-months/year $7.89
Electricity Fees $960 - $ -
Natural Gas $339,899 35,505 MMBtu $9.57
TOTAL ENERGY COSTS $1,491,732
RECOMMENDED SAVINGS* $77,768 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $65,116
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$27,383
Cost:
$88,700
$27,383 270,045 $27,383
270,045
kWh
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,204
Cost:
$5,760
$21,204 209,118 $21,204
209,118
kWh
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$9,343
Cost:
-
$9,343 92,144 $9,343
92,144
kWh
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,186
Cost:
-
$7,186 70,873 $7,186
70,873
kWh
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$6,819
Cost:
$26,495
$6,819 67,249 $6,819
67,249
kWh
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,833
Cost:
$8,590
$5,833 57,520 $5,833
57,520
kWh
TOTAL RECOMMENDED Savings:
$77,768
Cost:
$129,545
$77,768 766,949 $77,768
766,949
kWh
TOTAL IMPLEMENTED Savings:
$65,116
Cost:
$94,460
$65,116 642,180 $65,116
642,180
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage