IAC logo
IAC Assessment: MA0685
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0685
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2011
Principal Product Overhaul and repair of industrial gas turbines
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $50,000,000-$100,000,000
# of Employees 153
Plant Area (Sq.Ft.) 150,000
Annual Production 100 Pieces
Production Hrs. Annual 4,160
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,334 1,222,876 kWh $0.12
Electricity Demand $55,451 3,861 kW-months/year $14.36
Natural Gas $50,390 6,146 MMBtu $8.20
TOTAL ENERGY COSTS $256,175
RECOMMENDED SAVINGS* $16,479 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,233
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,634
Cost:
$7,050
$5,634 45,812 - - - - $5,634
45,812
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$3,714
Cost:
-
- - $3,714 276 - - -
-
kWh
$3,714
276
kW-months/year
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,520
Cost:
$9,425
- - $3,520 262 - - -
-
kWh
$3,520
262
kW-months/year
-
-
MMBtu
04: 2.7314 REDUCE VENTILATION AIR Savings:
$2,713
Cost:
$6,300
$1,542 12,542 - - $1,171 142 $1,542
12,542
kWh
-
-
kW-months/year
$1,171
142
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$898
Cost:
$1,280
$898 7,300 - - - - $898
7,300
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$16,479
Cost:
$24,055
$8,074 65,654 $7,234 538 $1,171 142 $8,074
65,654
kWh
$7,234
538
kW-months/year
$1,171
142
MMBtu
TOTAL IMPLEMENTED Savings:
$6,233
Cost:
$15,725
$1,542 12,542 $3,520 262 $1,171 142 $1,542
12,542
kWh
$3,520
262
kW-months/year
$1,171
142
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas