IAC logo
IAC Assessment: MA0692
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0692
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product Metalized paper
NAICS 322220 - Paper Bag and Coated and Treated Paper Manufacturing
SIC 2679 - Converted Paper Products, Nec
Sales $50,000,000-$100,000,000
# of Employees 70
Plant Area (Sq.Ft.) 85,000
Annual Production 700,000 Thousand Feet
Production Hrs. Annual 8,568
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,397,117 10,043,250 kWh $0.14
Electricity Demand $106,061 27,056 kW-months/year $3.92
Electricity Fees $4,800 - $ -
Natural Gas $521,641 61,164 MMBtu $8.53
TOTAL ENERGY COSTS $2,029,619
RECOMMENDED SAVINGS* $83,776 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$43,573
Cost:
$24,000
$7,065 72,089 $36,508 4,280 $7,065
72,089
kWh
$36,508
4,280
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,554
Cost:
$33,000
$28,554 291,371 - - $28,554
291,371
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,685
Cost:
$2,500
- - $3,685 432 -
-
kWh
$3,685
432
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,509
Cost:
$200
$2,509 25,601 - - $2,509
25,601
kWh
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,162
Cost:
$7,150
$2,162 22,058 - - $2,162
22,058
kWh
-
-
MMBtu
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,145
Cost:
$3,183
$1,145 11,684 - - $1,145
11,684
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,135
Cost:
$3,260
$1,135 11,580 - - $1,135
11,580
kWh
-
-
MMBtu
08: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$1,013
Cost:
$3,000
$1,013 10,340 - - $1,013
10,340
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$83,776
Cost:
$76,293
$43,583 444,723 $40,193 4,712 $43,583
444,723
kWh
$40,193
4,712
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas