IAC Assessment: MA0696
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0696
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product Talc powder
NAICS 212393 - Other Chemical and Fertilizer Mineral Mining
SIC 3295 - Minerals, Ground Or Treated
Sales $1,000,000-$5,000,000
# of Employees 26
Plant Area (Sq.Ft.) 80,000
Annual Production 80,000 Tons
Production Hrs. Annual 6,240
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $397,465 4,724,400 kWh $0.08
Electricity Demand $269,084 19,284 kW-months/year $13.95
Electricity Fees $6,722 - $ -
LPG $35,920 1,513 MMBtu $23.74
Fuel Oil #2 $174,807 7,312 MMBtu $23.91
Other Energy $4,674 166 MMBtu $28.16
TOTAL ENERGY COSTS $888,672
RECOMMENDED SAVINGS* $55,007 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,737
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Ancillary Material Cost Electricity Usage Fuel Oil #2 Ancillary Material Cost
$ kWh $ MMBtu $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$19,393
Cost:
$39,000
$4,393 52,241 - - $15,000 - $4,393
52,241
kWh
-
-
MMBtu
$15,000
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$15,781
Cost:
$2,800
$15,781 187,649 - - - - $15,781
187,649
kWh
-
-
MMBtu
-
-
$
03: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$6,647
Cost:
$4,000
- - $6,647 278 - - -
-
kWh
$6,647
278
MMBtu
-
-
$
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$3,539
Cost:
$17,500
- - $3,539 148 - - -
-
kWh
$3,539
148
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,048
Cost:
$6,600
$3,048 36,242 - - - - $3,048
36,242
kWh
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,462
Cost:
$6,035
$2,462 29,283 - - - - $2,462
29,283
kWh
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,810
Cost:
$200
$1,810 21,528 - - - - $1,810
21,528
kWh
-
-
MMBtu
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,705
Cost:
$4,080
$1,705 20,274 - - - - $1,705
20,274
kWh
-
-
MMBtu
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$622
Cost:
$1,100
- - $622 26 - - -
-
kWh
$622
26
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$55,007
Cost:
$81,315
$29,199 347,217 $10,808 452 $15,000 - $29,199
347,217
kWh
$10,808
452
MMBtu
$15,000
-
$
TOTAL IMPLEMENTED Savings:
$41,737
Cost:
$52,680
$26,737 317,934 - - $15,000 - $26,737
317,934
kWh
-
-
MMBtu
$15,000
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Ancillary Material Cost Electricity Usage Fuel Oil #2 Ancillary Material Cost