Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2012 |
Principal Product | Paper board |
NAICS | 322130 - Paperboard Mills |
SIC | 2631 - Paperboard Mills |
Sales | $50,000,000-$100,000,000 |
# of Employees | 34 |
Plant Area (Sq.Ft.) | 130,000 |
Annual Production | 45,000 Thousand Feet |
Production Hrs. Annual | 3,528 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $440,745 | 3,987,000 | kWh | $0.11 |
Electricity Demand | $219,381 | 18,018 | kW-months/year | $12.18 |
Electricity Fees | $26,000 | - | $ | - |
Fuel Oil #6 | $1,167,861 | 67,136 | MMBtu | $17.40 |
TOTAL ENERGY COSTS | $1,853,987 | |||
RECOMMENDED SAVINGS* | $204,733 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $26,827 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Fuel Oil #6 | Electricity Usage | Electricity Fees | Fuel Oil #6 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $82,439 Cost: $22,540 |
$2,173 | 24,697 | - | - | $80,266 | 4,613 |
$2,173 24,697 kWh |
- - $ |
$80,266 4,613 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $67,234 Cost: $180,000 |
- | - | - | - | $67,234 | 3,864 |
- - kWh |
- - $ |
$67,234 3,864 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY |
Savings: $23,122 Cost: $100,000 |
$5,565 | 63,240 | - | - | $17,557 | 1,009 |
$5,565 63,240 kWh |
- - $ |
$17,557 1,009 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $10,370 Cost: $3,000 |
- | - | - | - | $10,370 | 596 |
- - kWh |
- - $ |
$10,370 596 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8123 PAY UTILITY BILLS ON TIME |
Savings: $11,678 Cost: $500 |
- | - | $11,678 | - | - | - |
- - kWh |
$11,678 - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,779 Cost: $3,600 |
$4,779 | 54,312 | - | - | - | - |
$4,779 54,312 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,452 Cost: $8,700 |
$4,452 | 50,586 | - | - | - | - |
$4,452 50,586 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $659 Cost: $500 |
$659 | 7,488 | - | - | - | - |
$659 7,488 kWh |
- - $ |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $204,733 Cost: $318,840 |
$17,628 | 200,323 | $11,678 | - | $175,427 | 10,082 | $17,628 200,323 kWh |
$11,678 - $ |
$175,427 10,082 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $26,827 Cost: $7,100 |
$4,779 | 54,312 | $11,678 | - | $10,370 | 596 | $4,779 54,312 kWh |
$11,678 - $ |
$10,370 596 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Fuel Oil #6 | Electricity Usage | Electricity Fees | Fuel Oil #6 |