IAC logo
IAC Assessment: MA0697
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0697
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product Paper board
NAICS 322130 - Paperboard Mills
SIC 2631 - Paperboard Mills
Sales $50,000,000-$100,000,000
# of Employees 34
Plant Area (Sq.Ft.) 130,000
Annual Production 45,000 Thousand Feet
Production Hrs. Annual 3,528
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $440,745 3,987,000 kWh $0.11
Electricity Demand $219,381 18,018 kW-months/year $12.18
Electricity Fees $26,000 - $ -
Fuel Oil #6 $1,167,861 67,136 MMBtu $17.40
TOTAL ENERGY COSTS $1,853,987
RECOMMENDED SAVINGS* $204,733 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,827
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Fuel Oil #6 Electricity Usage Electricity Fees Fuel Oil #6
$ kWh $ $ $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$82,439
Cost:
$22,540
$2,173 24,697 - - $80,266 4,613 $2,173
24,697
kWh
-
-
$
$80,266
4,613
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$67,234
Cost:
$180,000
- - - - $67,234 3,864 -
-
kWh
-
-
$
$67,234
3,864
MMBtu
03: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$23,122
Cost:
$100,000
$5,565 63,240 - - $17,557 1,009 $5,565
63,240
kWh
-
-
$
$17,557
1,009
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$10,370
Cost:
$3,000
- - - - $10,370 596 -
-
kWh
-
-
$
$10,370
596
MMBtu
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$11,678
Cost:
$500
- - $11,678 - - - -
-
kWh
$11,678
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,779
Cost:
$3,600
$4,779 54,312 - - - - $4,779
54,312
kWh
-
-
$
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,452
Cost:
$8,700
$4,452 50,586 - - - - $4,452
50,586
kWh
-
-
$
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$659
Cost:
$500
$659 7,488 - - - - $659
7,488
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$204,733
Cost:
$318,840
$17,628 200,323 $11,678 - $175,427 10,082 $17,628
200,323
kWh
$11,678
-
$
$175,427
10,082
MMBtu
TOTAL IMPLEMENTED Savings:
$26,827
Cost:
$7,100
$4,779 54,312 $11,678 - $10,370 596 $4,779
54,312
kWh
$11,678
-
$
$10,370
596
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Fuel Oil #6 Electricity Usage Electricity Fees Fuel Oil #6