IAC logo
IAC Assessment: MA0711
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0711
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2013
Principal Product Photochemicals, Radiation Cured Chemicals and Additives
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 37,000
Annual Production 130 Tons
Production Hrs. Annual 4,335
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $140,800 1,292,127 kWh $0.11
Electricity Demand $53,203 4,498 kW-months/year $11.83
Electricity Fees $6,066 - $ -
Natural Gas $68,752 5,030 MMBtu $13.67
Fuel Oil #2 $4,743 169 MMBtu $28.03
TOTAL ENERGY COSTS $273,564
RECOMMENDED SAVINGS* $34,697 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,335
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$17,618
Cost:
$35,000
$17,618 167,473 - - - - $17,618
167,473
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$6,430
Cost:
$25,000
$7,063 67,141 $2,834 211 $(-3,467) (-270) $7,063
67,141
kWh
$2,834
211
kW-months/year
$(-3,467)
(-270)
MMBtu
03: 2.2611 MODERATE COOLING TOWER OUTLET TEMPERATURE Savings:
$6,314
Cost:
$14,000
$6,314 60,021 - - - - $6,314
60,021
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,170
Cost:
$2,000
- - - - $2,170 169 -
-
kWh
-
-
kW-months/year
$2,170
169
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,165
Cost:
$4,055
$1,601 15,215 $564 42 - - $1,601
15,215
kWh
$564
42
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$34,697
Cost:
$80,055
$32,596 309,850 $3,398 253 $(-1,297) (-101) $32,596
309,850
kWh
$3,398
253
kW-months/year
$(-1,297)
(-101)
MMBtu
TOTAL IMPLEMENTED Savings:
$4,335
Cost:
$6,055
$1,601 15,215 $564 42 $2,170 169 $1,601
15,215
kWh
$564
42
kW-months/year
$2,170
169
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas