IAC logo
IAC Assessment: MA0714
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0714
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2013
Principal Product Mica insullation products
NAICS 327999 - All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3299 - Nonmetallic Mineral Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 60,000
Annual Production 1,160,000 Pieces
Production Hrs. Annual 8,568
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $249,791 3,617,378 kWh $0.07
Electricity Demand $66,313 6,936 kW-months/year $9.56
Electricity Fees $70,200 - $ -
LPG $248,233 18,205 MMBtu $13.64
Fuel Oil #6 $299,105 17,164 MMBtu $17.43
TOTAL ENERGY COSTS $933,642
RECOMMENDED SAVINGS* $105,189 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $92,729
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #6 Electricity Usage Electricity Demand LPG Fuel Oil #6
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$64,988
Cost:
$67,000
- - - - $(-234,117) (-17,164) $299,105 17,164 -
-
kWh
-
-
kW-months/year
$(-234,117)
(-17,164)
MMBtu
$299,105
17,164
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$9,831
Cost:
$5,568
- - - - - - $9,831 564 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,831
564
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,362
Cost:
$13,800
$5,362 77,834 - - - - - - $5,362
77,834
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,919
Cost:
$12,300
$4,919 71,393 - - - - - - $4,919
71,393
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,187
Cost:
$7,500
- - - - $4,187 307 - - -
-
kWh
-
-
kW-months/year
$4,187
307
MMBtu
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,354
Cost:
$9,300
$149 2,160 - - $3,205 235 - - $149
2,160
kWh
-
-
kW-months/year
$3,205
235
MMBtu
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,188
Cost:
$13,500
- - $11,188 539 - - - - -
-
kWh
$11,188
539
kW-months/year
-
-
MMBtu
-
-
MMBtu
08: 2.6213 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS Savings:
$1,360
Cost:
$150
- - - - - - $1,360 78 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,360
78
MMBtu
TOTAL RECOMMENDED Savings:
$105,189
Cost:
$129,118
$10,430 151,387 $11,188 539 $(-226,725) (-16,622) $310,296 17,806 $10,430
151,387
kWh
$11,188
539
kW-months/year
$(-226,725)
(-16,622)
MMBtu
$310,296
17,806
MMBtu
TOTAL IMPLEMENTED Savings:
$92,729
Cost:
$100,018
$5,362 77,834 $11,188 539 $(-234,117) (-17,164) $310,296 17,806 $5,362
77,834
kWh
$11,188
539
kW-months/year
$(-234,117)
(-17,164)
MMBtu
$310,296
17,806
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand LPG Fuel Oil #6 Electricity Usage Electricity Demand LPG Fuel Oil #6