IAC logo
IAC Assessment: MA0716
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0716
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2013
Principal Product Bread and English muffins
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 90
Plant Area (Sq.Ft.) 21,716
Annual Production 80,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) VT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,236 1,198,228 kWh $0.08
Electricity Demand $47,169 2,464 kW-months/year $19.14
Electricity Fees $17,011 - $ -
LPG $279,789 7,291 MMBtu $38.37
TOTAL ENERGY COSTS $444,205
RECOMMENDED SAVINGS* $83,508 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $83,508
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Primary Raw Material Electricity Usage Electricity Demand LPG Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$33,408
Cost:
$70,705
$(-3,355) (-39,660) $(-1,799) (-94) $38,562 1,005 - - $(-3,355)
(-39,660)
kWh
$(-1,799)
(-94)
kW-months/year
$38,562
1,005
MMBtu
-
-
$
02: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$20,977
Cost:
$22,000
$(-698) (-8,249) $(-210) (-11) - - $21,885 - $(-698)
(-8,249)
kWh
$(-210)
(-11)
kW-months/year
-
-
MMBtu
$21,885
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$18,072
Cost:
$35,000
- - - - $18,072 471 - - -
-
kWh
-
-
kW-months/year
$18,072
471
MMBtu
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,554
Cost:
$10,000
$3,554 42,005 - - - - - - $3,554
42,005
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,726
Cost:
$10,000
$2,075 24,528 $651 34 - - - - $2,075
24,528
kWh
$651
34
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,965
Cost:
$6,300
$1,965 23,232 - - - - - - $1,965
23,232
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,343
Cost:
$935
- - - - $1,343 35 - - -
-
kWh
-
-
kW-months/year
$1,343
35
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,141
Cost:
$4,000
$1,141 13,484 - - - - - - $1,141
13,484
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$322
Cost:
$400
$322 3,811 - - - - - - $322
3,811
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$83,508
Cost:
$159,340
$5,004 59,151 $(-1,358) (-71) $57,977 1,511 $21,885 - $5,004
59,151
kWh
$(-1,358)
(-71)
kW-months/year
$57,977
1,511
MMBtu
$21,885
-
$
TOTAL IMPLEMENTED Savings:
$83,508
Cost:
$159,340
$5,004 59,151 $(-1,358) (-71) $57,977 1,511 $21,885 - $5,004
59,151
kWh
$(-1,358)
(-71)
kW-months/year
$57,977
1,511
MMBtu
$21,885
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG Primary Raw Material Electricity Usage Electricity Demand LPG Primary Raw Material