IAC logo
IAC Assessment: MA0718
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0718
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2013
Principal Product Eastern white pine lumber
NAICS 321912 - Cut Stock, Resawing Lumber, and Planing
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 48
Plant Area (Sq.Ft.) 66,300
Annual Production 25,000 Thousand Feet
Production Hrs. Annual 3,060
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $415,975 4,272,784 kWh $0.10
Electricity Demand $155,900 15,127 kW-months/year $10.31
Electricity Fees $9,050 - $ -
LPG $14,969 616 MMBtu $24.30
Fuel Oil #2 $45,781 1,867 MMBtu $24.52
Wood $55,479 53,346 MMBtu $1.04
TOTAL ENERGY COSTS $697,154
RECOMMENDED SAVINGS* $57,323 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,615
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Wood Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Wood Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 3.6123 BURN WOOD BY-PRODUCTS FOR HEAT Savings:
$37,299
Cost:
$200,000
- - - - $45,779 1,867 $(-3,480) (-2,320) $(-5,000) - -
-
kWh
-
-
kW-months/year
$45,779
1,867
MMBtu
$(-3,480)
(-2,320)
MMBtu
$(-5,000)
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,029
Cost:
$1,000
$13,029 151,321 - - - - - - - - $13,029
151,321
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,409
Cost:
$26,750
$3,995 46,395 $1,414 143 - - - - - - $3,995
46,395
kWh
$1,414
143
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$809
Cost:
$1,400
- - - - $809 33 - - - - -
-
kWh
-
-
kW-months/year
$809
33
MMBtu
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$777
Cost:
$200
$777 9,028 - - - - - - - - $777
9,028
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$57,323
Cost:
$229,350
$17,801 206,744 $1,414 143 $46,588 1,900 $(-3,480) (-2,320) $(-5,000) - $17,801
206,744
kWh
$1,414
143
kW-months/year
$46,588
1,900
MMBtu
$(-3,480)
(-2,320)
MMBtu
$(-5,000)
-
$
TOTAL IMPLEMENTED Savings:
$14,615
Cost:
$2,600
$13,806 160,349 - - $809 33 - - - - $13,806
160,349
kWh
-
-
kW-months/year
$809
33
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #2 Wood Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Wood Administrative Changes