IAC logo
IAC Assessment: MA0725
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0725
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2014
Principal Product Fine paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $50,000,000-$100,000,000
# of Employees 106
Plant Area (Sq.Ft.) 232,000
Annual Production 22,000 Tons
Production Hrs. Annual 6,500
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $942,026 14,750,134 kWh $0.06
Electricity Demand $422,287 38,216 kW-months/year $11.05
LPG $143,333 9,816 MMBtu $14.60
Fuel Oil #6 $3,118,729 188,114 MMBtu $16.58
TOTAL ENERGY COSTS $4,626,375
RECOMMENDED SAVINGS* $1,544,872 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,114,753
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #6 Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #6 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$1,049,475
Cost:
$2,750,000
- - - - $(-2,069,254) (-188,114) - - $3,118,729 188,114 - - -
-
kWh
-
-
kW-months/year
$(-2,069,254)
(-188,114)
MMBtu
-
-
MMBtu
$3,118,729
188,114
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$263,264
Cost:
$594,880
$(-15,272) (-174,340) $(-5,934) (-537) - - - - $324,470 19,570 $(-40,000) - $(-15,272)
(-174,340)
kWh
$(-5,934)
(-537)
kW-months/year
-
-
MMBtu
-
-
MMBtu
$324,470
19,570
MMBtu
$(-40,000)
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$77,937
Cost:
$10,000
$2,233 25,491 - - - - - - $75,704 4,566 - - $2,233
25,491
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$75,704
4,566
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$74,123
Cost:
$120,280
$(-4,248) (-48,490) $(-995) (-90) - - $79,366 5,436 - - - - $(-4,248)
(-48,490)
kWh
$(-995)
(-90)
kW-months/year
-
-
MMBtu
$79,366
5,436
MMBtu
-
-
MMBtu
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$28,833
Cost:
$9,690
- - - - - - - - $28,833 1,739 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$28,833
1,739
MMBtu
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$23,788
Cost:
$9,000
$23,788 271,550 - - - - - - - - - - $23,788
271,550
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,381
Cost:
$15,200
$6,381 72,844 - - - - - - - - - - $6,381
72,844
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,977
Cost:
$12,270
$4,977 56,818 - - - - - - - - - - $4,977
56,818
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,970
Cost:
$13,450
$4,970 56,733 - - - - - - - - - - $4,970
56,733
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,314
Cost:
$10,600
$4,314 49,242 - - - - - - - - - - $4,314
49,242
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
11: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,444
Cost:
$10,200
$3,444 39,312 - - - - - - - - - - $3,444
39,312
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
$
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,366
Cost:
$30,760
- - - - - - - - $3,366 203 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$3,366
203
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$1,544,872
Cost:
$3,586,330
$30,587 349,160 $(-6,929) (-627) $(-2,069,254) (-188,114) $79,366 5,436 $3,551,102 214,192 $(-40,000) - $30,587
349,160
kWh
$(-6,929)
(-627)
kW-months/year
$(-2,069,254)
(-188,114)
MMBtu
$79,366
5,436
MMBtu
$3,551,102
214,192
MMBtu
$(-40,000)
-
$
TOTAL IMPLEMENTED Savings:
$1,114,753
Cost:
$2,822,320
$33,079 377,610 - - $(-2,069,254) (-188,114) - - $3,150,928 190,056 - - $33,079
377,610
kWh
-
-
kW-months/year
$(-2,069,254)
(-188,114)
MMBtu
-
-
MMBtu
$3,150,928
190,056
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #6 Administrative Changes Electricity Usage Electricity Demand Natural Gas LPG Fuel Oil #6 Administrative Changes