Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2014 |
Principal Product | Miniature Precision Zinc and Plastic Parts |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3364 - Nonferrous Die-casting Exc. Aluminum |
Sales | $1,000,000-$5,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 24,000 |
Annual Production | 390,000 Pounds |
Production Hrs. Annual | 4,000 |
Location (State) | RI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $70,153 | 773,760 | kWh | $0.09 |
Electricity Demand | $8,504 | 2,542 | kW-months/year | $3.35 |
Electricity Fees | $9,741 | - | $ | - |
Natural Gas | $6,004 | 476 | MMBtu | $12.61 |
LPG | $3,679 | 108 | MMBtu | $34.06 |
TOTAL ENERGY COSTS | $98,081 | |||
RECOMMENDED SAVINGS* | $24,663 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $338 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | LPG | Electricity Usage | Electricity Demand | Natural Gas | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $13,242 Cost: $53,572 |
$20,246 | 223,222 | $1,045 | 312 | $(-8,049) | (-859) | - | - |
$20,246 223,222 kWh |
$1,045 312 kW-months/year |
$(-8,049) (-859) MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,069 Cost: $15,975 |
$5,069 | 55,889 | - | - | - | - | - | - |
$5,069 55,889 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL |
Savings: $2,667 Cost: $2,565 |
- | - | - | - | $(-1,012) | (-108) | $3,679 | 108 |
- - kWh |
- - kW-months/year |
$(-1,012) (-108) MMBtu |
$3,679 108 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $2,594 Cost: $2,614 |
$2,594 | 28,596 | - | - | - | - | - | - |
$2,594 28,596 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $753 Cost: $2,210 |
$753 | 8,310 | - | - | - | - | - | - |
$753 8,310 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $338 Cost: $300 |
$338 | 3,722 | - | - | - | - | - | - |
$338 3,722 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $24,663 Cost: $77,236 |
$29,000 | 319,739 | $1,045 | 312 | $(-9,061) | (-967) | $3,679 | 108 | $29,000 319,739 kWh |
$1,045 312 kW-months/year |
$(-9,061) (-967) MMBtu |
$3,679 108 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $338 Cost: $300 |
$338 | 3,722 | - | - | - | - | - | - | $338 3,722 kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | LPG | Electricity Usage | Electricity Demand | Natural Gas | LPG |