IAC logo
IAC Assessment: MA0740
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0740
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2015
Principal Product Composite parts
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 31,750
Annual Production 29 Pieces
Production Hrs. Annual 6,146
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $217,942 2,123,047 kWh $0.10
Electricity Demand $88,132 7,297 kW-months/year $12.08
Electricity Fees $11,792 - $ -
Natural Gas $29,458 1,022 MMBtu $28.82
TOTAL ENERGY COSTS $347,324
RECOMMENDED SAVINGS* $43,168 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,516
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$18,853
Cost:
$200
- - $18,853 - - - -
-
kWh
$18,853
-
$
-
-
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,057
Cost:
$4,200
$5,057 49,236 - - - - $5,057
49,236
kWh
-
-
$
-
-
MMBtu
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$4,672
Cost:
$11,200
$4,672 45,487 - - - - $4,672
45,487
kWh
-
-
$
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,745
Cost:
$6,695
$3,745 36,467 - - - - $3,745
36,467
kWh
-
-
$
-
-
MMBtu
05: 2.7314 REDUCE VENTILATION AIR Savings:
$3,084
Cost:
$2,450
$1,016 9,889 - - $2,068 295 $1,016
9,889
kWh
-
-
$
$2,068
295
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,904
Cost:
$1,425
$2,904 28,276 - - - - $2,904
28,276
kWh
-
-
$
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,652
Cost:
$5,375
$2,652 25,820 - - - - $2,652
25,820
kWh
-
-
$
-
-
MMBtu
08: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$1,775
Cost:
$2,010
$1,775 17,284 - - - - $1,775
17,284
kWh
-
-
$
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$426
Cost:
$500
$426 4,147 - - - - $426
4,147
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,168
Cost:
$34,055
$22,247 216,606 $18,853 - $2,068 295 $22,247
216,606
kWh
$18,853
-
$
$2,068
295
MMBtu
TOTAL IMPLEMENTED Savings:
$40,516
Cost:
$28,680
$19,595 190,786 $18,853 - $2,068 295 $19,595
190,786
kWh
$18,853
-
$
$2,068
295
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas