Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2015 |
Principal Product | Invstment castting |
NAICS | 331512 - Steel Investment Foundries |
SIC | 3324 - Steel Investment Foundries |
Sales | $10,000,000-$50,000,000 |
# of Employees | 88 |
Plant Area (Sq.Ft.) | 98,870 |
Annual Production | 109,000,000 Pounds |
Production Hrs. Annual | 5,712 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $631,649 | 8,599,923 | kWh | $0.07 |
Electricity Demand | $309,003 | 52,813 | kW-months/year | $5.85 |
Electricity Fees | $12,159 | - | $ | - |
Natural Gas | $631,571 | 84,561 | MMBtu | $7.47 |
TOTAL ENERGY COSTS | $1,584,382 | |||
RECOMMENDED SAVINGS* | $287,181 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $131,224 Cost: $279,750 |
- | - | - | - | $131,224 | 17,757 |
- - kWh |
- - kW-months/year |
$131,224 17,757 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $91,436 Cost: $5,000 |
- | - | - | - | $91,436 | 12,373 |
- - kWh |
- - kW-months/year |
$91,436 12,373 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $35,787 Cost: $14,025 |
$25,456 | 346,809 | - | - | $10,331 | 1,398 |
$25,456 346,809 kWh |
- - kW-months/year |
$10,331 1,398 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $24,147 Cost: $29,732 |
$33,934 | 462,315 | $3,931 | 672 | $(-13,718) | (-1,856) |
$33,934 462,315 kWh |
$3,931 672 kW-months/year |
$(-13,718) (-1,856) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,279 Cost: $7,050 |
$3,279 | 44,670 | - | - | - | - |
$3,279 44,670 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,308 Cost: $2,775 |
- | - | - | - | $1,308 | 177 |
- - kWh |
- - kW-months/year |
$1,308 177 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $287,181 Cost: $338,332 |
$62,669 | 853,794 | $3,931 | 672 | $220,581 | 29,849 | $62,669 853,794 kWh |
$3,931 672 kW-months/year |
$220,581 29,849 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |