IAC logo
IAC Assessment: MA0741
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0741
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2015
Principal Product Invstment castting
NAICS 331512 - Steel Investment Foundries
SIC 3324 - Steel Investment Foundries
Sales $10,000,000-$50,000,000
# of Employees 88
Plant Area (Sq.Ft.) 98,870
Annual Production 109,000,000 Pounds
Production Hrs. Annual 5,712
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $631,649 8,599,923 kWh $0.07
Electricity Demand $309,003 52,813 kW-months/year $5.85
Electricity Fees $12,159 - $ -
Natural Gas $631,571 84,561 MMBtu $7.47
TOTAL ENERGY COSTS $1,584,382
RECOMMENDED SAVINGS* $287,181 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$131,224
Cost:
$279,750
- - - - $131,224 17,757 -
-
kWh
-
-
kW-months/year
$131,224
17,757
MMBtu
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$91,436
Cost:
$5,000
- - - - $91,436 12,373 -
-
kWh
-
-
kW-months/year
$91,436
12,373
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$35,787
Cost:
$14,025
$25,456 346,809 - - $10,331 1,398 $25,456
346,809
kWh
-
-
kW-months/year
$10,331
1,398
MMBtu
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$24,147
Cost:
$29,732
$33,934 462,315 $3,931 672 $(-13,718) (-1,856) $33,934
462,315
kWh
$3,931
672
kW-months/year
$(-13,718)
(-1,856)
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,279
Cost:
$7,050
$3,279 44,670 - - - - $3,279
44,670
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,308
Cost:
$2,775
- - - - $1,308 177 -
-
kWh
-
-
kW-months/year
$1,308
177
MMBtu
TOTAL RECOMMENDED Savings:
$287,181
Cost:
$338,332
$62,669 853,794 $3,931 672 $220,581 29,849 $62,669
853,794
kWh
$3,931
672
kW-months/year
$220,581
29,849
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas