Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2015 |
Principal Product | Non-woven fabrics paper |
NAICS | 313230 - Nonwoven Fabric Mills |
SIC | 2297 - Nonwoven Fabrics |
Sales | $10,000,000-$50,000,000 |
# of Employees | 108 |
Plant Area (Sq.Ft.) | 162,000 |
Annual Production | 7,500,000 Pounds |
Production Hrs. Annual | 8,232 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $641,393 | 8,393,712 | kWh | $0.08 |
Electricity Demand | $244,714 | 15,442 | kW-months/year | $15.85 |
Electricity Fees | $45,407 | - | $ | - |
Natural Gas | $648,815 | 63,705 | MMBtu | $10.18 |
TOTAL ENERGY COSTS | $1,580,329 | |||
RECOMMENDED SAVINGS* | $151,639 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $82,545 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $55,652 Cost: $120,000 |
$58,606 | 767,095 | $27,199 | 1,716 | $(-30,153) | (-3,080) |
$58,606 767,095 kWh |
$27,199 1,716 kW-months/year |
$(-30,153) (-3,080) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $38,357 Cost: $25,972 |
- | - | $38,357 | 2,420 | - | - |
- - kWh |
$38,357 2,420 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $24,583 Cost: $5,560 |
- | - | - | - | $24,583 | 2,511 |
- - kWh |
- - kW-months/year |
$24,583 2,511 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $9,330 Cost: $1,000 |
- | - | - | - | $9,330 | 953 |
- - kWh |
- - kW-months/year |
$9,330 953 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,116 Cost: $9,000 |
- | - | - | - | $8,116 | 829 |
- - kWh |
- - kW-months/year |
$8,116 829 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,465 Cost: $11,685 |
$7,465 | 97,709 | - | - | - | - |
$7,465 97,709 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,112 Cost: $4,285 |
$4,112 | 53,823 | - | - | - | - |
$4,112 53,823 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $4,024 Cost: $11,650 |
- | - | - | - | $4,024 | 411 |
- - kWh |
- - kW-months/year |
$4,024 411 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $151,639 Cost: $189,152 |
$70,183 | 918,627 | $65,556 | 4,136 | $15,900 | 1,624 | $70,183 918,627 kWh |
$65,556 4,136 kW-months/year |
$15,900 1,624 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $82,545 Cost: $63,867 |
$7,465 | 97,709 | $38,357 | 2,420 | $36,723 | 3,751 | $7,465 97,709 kWh |
$38,357 2,420 kW-months/year |
$36,723 3,751 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |