IAC logo
IAC Assessment: MA0742
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0742
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2015
Principal Product Non-woven fabrics paper
NAICS 313230 - Nonwoven Fabric Mills
SIC 2297 - Nonwoven Fabrics
Sales $10,000,000-$50,000,000
# of Employees 108
Plant Area (Sq.Ft.) 162,000
Annual Production 7,500,000 Pounds
Production Hrs. Annual 8,232
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $641,393 8,393,712 kWh $0.08
Electricity Demand $244,714 15,442 kW-months/year $15.85
Electricity Fees $45,407 - $ -
Natural Gas $648,815 63,705 MMBtu $10.18
TOTAL ENERGY COSTS $1,580,329
RECOMMENDED SAVINGS* $151,639 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $82,545
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$55,652
Cost:
$120,000
$58,606 767,095 $27,199 1,716 $(-30,153) (-3,080) $58,606
767,095
kWh
$27,199
1,716
kW-months/year
$(-30,153)
(-3,080)
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$38,357
Cost:
$25,972
- - $38,357 2,420 - - -
-
kWh
$38,357
2,420
kW-months/year
-
-
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$24,583
Cost:
$5,560
- - - - $24,583 2,511 -
-
kWh
-
-
kW-months/year
$24,583
2,511
MMBtu
04: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$9,330
Cost:
$1,000
- - - - $9,330 953 -
-
kWh
-
-
kW-months/year
$9,330
953
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,116
Cost:
$9,000
- - - - $8,116 829 -
-
kWh
-
-
kW-months/year
$8,116
829
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,465
Cost:
$11,685
$7,465 97,709 - - - - $7,465
97,709
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,112
Cost:
$4,285
$4,112 53,823 - - - - $4,112
53,823
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$4,024
Cost:
$11,650
- - - - $4,024 411 -
-
kWh
-
-
kW-months/year
$4,024
411
MMBtu
TOTAL RECOMMENDED Savings:
$151,639
Cost:
$189,152
$70,183 918,627 $65,556 4,136 $15,900 1,624 $70,183
918,627
kWh
$65,556
4,136
kW-months/year
$15,900
1,624
MMBtu
TOTAL IMPLEMENTED Savings:
$82,545
Cost:
$63,867
$7,465 97,709 $38,357 2,420 $36,723 3,751 $7,465
97,709
kWh
$38,357
2,420
kW-months/year
$36,723
3,751
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas