IAC Assessment: MA0762
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0762
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2016
Principal Product Adhesives
NAICS 325520 - Adhesive Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 176,000
Annual Production 5,700 Thousand Feet
Production Hrs. Annual 6,240
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,376,912 11,503,200 kWh $0.12
Electricity Demand $269,209 30,248 kW-months/year $8.90
Natural Gas $1,022,782 75,601 MMBtu $13.53
TOTAL ENERGY COSTS $2,707,438
RECOMMENDED SAVINGS* $345,511 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $222,271
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Usage Water Disposal Electricity Usage Natural Gas Water Usage Water Disposal
$ kWh $ MMBtu $ Tgal $ Tgal
01: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$94,561
Cost:
$209,164
- - $94,561 6,989 - - - - -
-
kWh
$94,561
6,989
MMBtu
-
-
Tgal
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$65,741
Cost:
$161,899
$65,741 547,841 - - - - - - $65,741
547,841
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$52,257
Cost:
$19,975
$52,257 435,472 - - - - - - $52,257
435,472
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$49,046
Cost:
$65,000
- - $49,046 3,625 - - - - -
-
kWh
$49,046
3,625
MMBtu
-
-
Tgal
-
-
Tgal
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$47,587
Cost:
$19,980
$47,587 396,560 - - - - - - $47,587
396,560
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,640
Cost:
$13,585
$7,640 63,666 - - - - - - $7,640
63,666
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,359
Cost:
$2,631
- - $6,359 470 - - - - -
-
kWh
$6,359
470
MMBtu
-
-
Tgal
-
-
Tgal
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,943
Cost:
$100
$13,081 109,009 - - $(-62) (-13,824) $(-76) (-14) $13,081
109,009
kWh
-
-
MMBtu
$(-62)
(-13,824)
Tgal
$(-76)
(-14)
Tgal
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,192
Cost:
$4,000
$6,192 51,596 - - - - - - $6,192
51,596
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,185
Cost:
$7,200
$3,185 26,542 - - - - - - $3,185
26,542
kWh
-
-
MMBtu
-
-
Tgal
-
-
Tgal
TOTAL RECOMMENDED Savings:
$345,511
Cost:
$503,534
$195,683 1,630,686 $149,966 11,084 $(-62) (-13,824) $(-76) (-14) $195,683
1,630,686
kWh
$149,966
11,084
MMBtu
$(-62)
(-13,824)
Tgal
$(-76)
(-14)
Tgal
TOTAL IMPLEMENTED Savings:
$222,271
Cost:
$280,439
$173,225 1,443,539 $49,046 3,625 - - - - $173,225
1,443,539
kWh
$49,046
3,625
MMBtu
-
-
Tgal
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal $ Tgal
Electricity Usage Natural Gas Water Usage Water Disposal Electricity Usage Natural Gas Water Usage Water Disposal