Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2016 |
Principal Product | Adhesives |
NAICS | 325520 - Adhesive Manufacturing |
SIC | 2891 - Adhesives And Sealants |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 176,000 |
Annual Production | 5,700 Thousand Feet |
Production Hrs. Annual | 6,240 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,376,912 | 11,503,200 | kWh | $0.12 |
Electricity Demand | $269,209 | 30,248 | kW-months/year | $8.90 |
Natural Gas | $1,022,782 | 75,601 | MMBtu | $13.53 |
TOTAL ENERGY COSTS | $2,707,438 | |||
RECOMMENDED SAVINGS* | $345,511 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $222,271 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Usage | Water Disposal | Electricity Usage | Natural Gas | Water Usage | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR |
Savings: $94,561 Cost: $209,164 |
- | - | $94,561 | 6,989 | - | - | - | - |
- - kWh |
$94,561 6,989 MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $65,741 Cost: $161,899 |
$65,741 | 547,841 | - | - | - | - | - | - |
$65,741 547,841 kWh |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $52,257 Cost: $19,975 |
$52,257 | 435,472 | - | - | - | - | - | - |
$52,257 435,472 kWh |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $49,046 Cost: $65,000 |
- | - | $49,046 | 3,625 | - | - | - | - |
- - kWh |
$49,046 3,625 MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $47,587 Cost: $19,980 |
$47,587 | 396,560 | - | - | - | - | - | - |
$47,587 396,560 kWh |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,640 Cost: $13,585 |
$7,640 | 63,666 | - | - | - | - | - | - |
$7,640 63,666 kWh |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $6,359 Cost: $2,631 |
- | - | $6,359 | 470 | - | - | - | - |
- - kWh |
$6,359 470 MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $12,943 Cost: $100 |
$13,081 | 109,009 | - | - | $(-62) | (-13,824) | $(-76) | (-14) |
$13,081 109,009 kWh |
- - MMBtu |
$(-62) (-13,824) Tgal |
$(-76) (-14) Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $6,192 Cost: $4,000 |
$6,192 | 51,596 | - | - | - | - | - | - |
$6,192 51,596 kWh |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,185 Cost: $7,200 |
$3,185 | 26,542 | - | - | - | - | - | - |
$3,185 26,542 kWh |
- - MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $345,511 Cost: $503,534 |
$195,683 | 1,630,686 | $149,966 | 11,084 | $(-62) | (-13,824) | $(-76) | (-14) | $195,683 1,630,686 kWh |
$149,966 11,084 MMBtu |
$(-62) (-13,824) Tgal |
$(-76) (-14) Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $222,271 Cost: $280,439 |
$173,225 | 1,443,539 | $49,046 | 3,625 | - | - | - | - | $173,225 1,443,539 kWh |
$49,046 3,625 MMBtu |
- - Tgal |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Usage | Water Disposal | Electricity Usage | Natural Gas | Water Usage | Water Disposal |