IAC Assessment: MA0777
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0777
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2017
Principal Product Resins
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $50,000,000-$100,000,000
# of Employees 255
Plant Area (Sq.Ft.) 88,000
Annual Production 6,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $885,304 7,703,850 kWh $0.11
Electricity Demand $120,756 20,977 kW-months/year $5.76
Electricity Fees $5,352 - $ -
Natural Gas $190,424 21,562 MMBtu $8.83
TOTAL ENERGY COSTS $1,201,836
RECOMMENDED SAVINGS* $66,757 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$39,579
Cost:
$137,422
$34,499 299,993 $5,080 882 $34,499
299,993
kWh
$5,080
882
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,610
Cost:
$30,976
$8,378 72,851 $1,232 214 $8,378
72,851
kWh
$1,232
214
kW-months/year
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,136
Cost:
$5,392
- - $2,136 371 -
-
kWh
$2,136
371
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,805
Cost:
$3,330
$2,805 24,397 - - $2,805
24,397
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,627
Cost:
$11,435
$12,627 109,800 - - $12,627
109,800
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$66,757
Cost:
$188,555
$58,309 507,041 $8,448 1,467 $58,309
507,041
kWh
$8,448
1,467
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand