Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2017 |
Principal Product | Nylon Tape |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $10,000,000-$50,000,000 |
# of Employees | 60 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 20,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $623,074 | 8,680,072 | kWh | $0.07 |
Electricity Demand | $183,183 | 14,849 | kW-months/year | $12.34 |
Electricity Fees | $7,654 | - | $ | - |
Natural Gas | $567,228 | 113,419 | MMBtu | $5.00 |
TOTAL ENERGY COSTS | $1,381,139 | |||
RECOMMENDED SAVINGS* | $144,778 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $42,520 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $93,550 Cost: $132,200 |
$93,780 | 1,302,495 | $31,531 | 2,556 | $(-31,761) | (-6,351) |
$93,780 1,302,495 kWh |
$31,531 2,556 kW-months/year |
$(-31,761) (-6,351) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $17,208 Cost: $14,500 |
- | - | - | - | $17,208 | 3,441 |
- - kWh |
- - kW-months/year |
$17,208 3,441 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.3311 REPLACE DC EQUIPMENT WITH AC EQUIPMENT |
Savings: $17,175 Cost: $73,000 |
$17,175 | 238,548 | - | - | - | - |
$17,175 238,548 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,137 Cost: $11,649 |
$5,472 | 76,003 | $2,665 | 216 | - | - |
$5,472 76,003 kWh |
$2,665 216 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN |
Savings: $8,708 Cost: $9,000 |
$8,708 | 120,942 | - | - | - | - |
$8,708 120,942 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $144,778 Cost: $240,349 |
$125,135 | 1,737,988 | $34,196 | 2,772 | $(-14,553) | (-2,910) | $125,135 1,737,988 kWh |
$34,196 2,772 kW-months/year |
$(-14,553) (-2,910) MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $42,520 Cost: $99,149 |
$22,647 | 314,551 | $2,665 | 216 | $17,208 | 3,441 | $22,647 314,551 kWh |
$2,665 216 kW-months/year |
$17,208 3,441 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |