Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2018 |
Principal Product | Soup |
NAICS | 311412 - Frozen Specialty Food Manufacturing |
SIC | 2038 - Frozen Specialties, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 2,027 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | MA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,231,502 | 9,113,000 | kWh | $0.14 |
Electricity Demand | $99,219 | 18,096 | kW-months/year | $5.48 |
Natural Gas | $912,567 | 64,000 | MMBtu | $14.26 |
TOTAL ENERGY COSTS | $2,243,288 | |||
RECOMMENDED SAVINGS* | $192,785 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $149,880 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2621 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE |
Savings: $98,644 Cost: $110,000 |
$98,644 | 730,696 | - | - | - | - |
$98,644 730,696 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $43,627 Cost: $17,006 |
$41,330 | 306,144 | $2,297 | 419 | - | - |
$41,330 306,144 kWh |
$2,297 419 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $31,698 Cost: $116,889 |
$31,698 | 234,802 | - | - | - | - |
$31,698 234,802 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $7,164 Cost: $6,660 |
$7,164 | 53,070 | - | - | - | - |
$7,164 53,070 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,116 Cost: $10,462 |
$4,116 | 30,493 | - | - | - | - |
$4,116 30,493 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $3,493 Cost: $1,750 |
- | - | - | - | $3,493 | 245 |
- - kWh |
- - kW-months/year |
$3,493 245 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE |
Savings: $4,043 Cost: $18,200 |
$4,043 | 29,945 | - | - | - | - |
$4,043 29,945 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $192,785 Cost: $280,967 |
$186,995 | 1,385,150 | $2,297 | 419 | $3,493 | 245 | $186,995 1,385,150 kWh |
$2,297 419 kW-months/year |
$3,493 245 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $149,880 Cost: $139,218 |
$144,090 | 1,067,333 | $2,297 | 419 | $3,493 | 245 | $144,090 1,067,333 kWh |
$2,297 419 kW-months/year |
$3,493 245 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |