IAC logo
IAC Assessment: MA0791
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0791
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2018
Principal Product Specialty paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 100,000
Annual Production 4,200,000 Pounds
Production Hrs. Annual 6,120
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $476,465 5,188,000 kWh $0.09
Electricity Demand $163,176 10,848 kW-months/year $15.04
Electricity Fees $9,120 - $ -
Natural Gas $146,046 22,803 MMBtu $6.40
TOTAL ENERGY COSTS $794,807
RECOMMENDED SAVINGS* $93,314 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,287
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$74,318
Cost:
$264,000
$67,565 734,400 $28,159 1,872 $(-21,406) (-3,342) $67,565
734,400
kWh
$28,159
1,872
kW-months/year
$(-21,406)
(-3,342)
MMBtu
02: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE Savings:
$16,275
Cost:
$1,000
- - - - $16,275 2,541 -
-
kWh
-
-
kW-months/year
$16,275
2,541
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,313
Cost:
$238
- - - - $1,313 205 -
-
kWh
-
-
kW-months/year
$1,313
205
MMBtu
04: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$974
Cost:
$1,000
- - - - $974 152 -
-
kWh
-
-
kW-months/year
$974
152
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$434
Cost:
$200
$434 4,722 - - - - $434
4,722
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$93,314
Cost:
$266,438
$67,999 739,122 $28,159 1,872 $(-2,844) (-444) $67,999
739,122
kWh
$28,159
1,872
kW-months/year
$(-2,844)
(-444)
MMBtu
TOTAL IMPLEMENTED Savings:
$2,287
Cost:
$1,238
- - - - $2,287 357 -
-
kWh
-
-
kW-months/year
$2,287
357
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas