IAC Assessment: MA0803
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0803
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2019
Principal Product Commercial and Residential Wastewater Treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $500,000-$1,000,000
# of Employees 20
Plant Area (Sq.Ft.) 479,160
Annual Production 30,660,000,000 Units
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,073 2,098,400 kWh $0.11
Electricity Demand $20,301 3,580 kW-months/year $5.67
Electricity Fees $2,631 - $ -
Natural Gas $30,470 2,883 MMBtu $10.57
Fuel Oil #2 $8,510 528 MMBtu $16.12
TOTAL ENERGY COSTS $302,985
RECOMMENDED SAVINGS* $13,962 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,437
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,194
Cost:
$11,175
$9,194 79,944 - - - - $9,194
79,944
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,308
Cost:
$1,000
$2,044 17,772 - - $264 25 $2,044
17,772
kWh
-
-
kW-months/year
$264
25
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,935
Cost:
$3,589
$1,589 13,816 $346 61 - - $1,589
13,816
kWh
$346
61
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$525
Cost:
$2,000
$525 4,563 - - - - $525
4,563
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,962
Cost:
$17,764
$13,352 116,095 $346 61 $264 25 $13,352
116,095
kWh
$346
61
kW-months/year
$264
25
MMBtu
TOTAL IMPLEMENTED Savings:
$13,437
Cost:
$15,764
$12,827 111,532 $346 61 $264 25 $12,827
111,532
kWh
$346
61
kW-months/year
$264
25
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas