Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2019 |
Principal Product | Prefabricated Wood Buildings and Homes |
NAICS | 321992 - Prefabricated Wood Building Manufacturing |
SIC | 2452 - Prefabricated Wood Buildings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 40 |
Plant Area (Sq.Ft.) | 32,000 |
Annual Production | 100 Pieces |
Production Hrs. Annual | 2,184 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $47,163 | 472,186 | kWh | $0.10 |
Electricity Demand | $35,373 | 2,640 | kW-months/year | $13.40 |
Electricity Fees | $2,434 | - | $ | - |
Fuel Oil #2 | $44,948 | 2,499 | MMBtu | $17.99 |
TOTAL ENERGY COSTS | $129,918 | |||
RECOMMENDED SAVINGS* | $33,427 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $22,072 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #2 | Electricity Usage | Electricity Demand | Fuel Oil #2 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $10,917 Cost: $100 |
- | - | - | - | $10,917 | 607 |
- - kWh |
- - kW-months/year |
$10,917 607 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,356 Cost: $9,356 |
$5,952 | 59,518 | $3,404 | 254 | - | - |
$5,952 59,518 kWh |
$3,404 254 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $6,808 Cost: $17,300 |
$3,632 | 36,321 | $3,176 | 237 | - | - |
$3,632 36,321 kWh |
$3,176 237 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $4,547 Cost: $10,850 |
$4,547 | 45,467 | - | - | - | - |
$4,547 45,467 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $1,241 Cost: $5,413 |
- | - | - | - | $1,241 | 69 |
- - kWh |
- - kW-months/year |
$1,241 69 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $558 Cost: $470 |
- | - | - | - | $558 | 31 |
- - kWh |
- - kW-months/year |
$558 31 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $33,427 Cost: $43,489 |
$14,131 | 141,306 | $6,580 | 491 | $12,716 | 707 | $14,131 141,306 kWh |
$6,580 491 kW-months/year |
$12,716 707 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $22,072 Cost: $15,339 |
$5,952 | 59,518 | $3,404 | 254 | $12,716 | 707 | $5,952 59,518 kWh |
$3,404 254 kW-months/year |
$12,716 707 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #2 | Electricity Usage | Electricity Demand | Fuel Oil #2 |