IAC Assessment: MA0807
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0807
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2019
Principal Product Prefabricated Wood Buildings and Homes
NAICS 321992 - Prefabricated Wood Building Manufacturing
SIC 2452 - Prefabricated Wood Buildings
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 32,000
Annual Production 100 Pieces
Production Hrs. Annual 2,184
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,163 472,186 kWh $0.10
Electricity Demand $35,373 2,640 kW-months/year $13.40
Electricity Fees $2,434 - $ -
Fuel Oil #2 $44,948 2,499 MMBtu $17.99
TOTAL ENERGY COSTS $129,918
RECOMMENDED SAVINGS* $33,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,072
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu
01: 2.7314 REDUCE VENTILATION AIR Savings:
$10,917
Cost:
$100
- - - - $10,917 607 -
-
kWh
-
-
kW-months/year
$10,917
607
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,356
Cost:
$9,356
$5,952 59,518 $3,404 254 - - $5,952
59,518
kWh
$3,404
254
kW-months/year
-
-
MMBtu
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$6,808
Cost:
$17,300
$3,632 36,321 $3,176 237 - - $3,632
36,321
kWh
$3,176
237
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,547
Cost:
$10,850
$4,547 45,467 - - - - $4,547
45,467
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$1,241
Cost:
$5,413
- - - - $1,241 69 -
-
kWh
-
-
kW-months/year
$1,241
69
MMBtu
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$558
Cost:
$470
- - - - $558 31 -
-
kWh
-
-
kW-months/year
$558
31
MMBtu
TOTAL RECOMMENDED Savings:
$33,427
Cost:
$43,489
$14,131 141,306 $6,580 491 $12,716 707 $14,131
141,306
kWh
$6,580
491
kW-months/year
$12,716
707
MMBtu
TOTAL IMPLEMENTED Savings:
$22,072
Cost:
$15,339
$5,952 59,518 $3,404 254 $12,716 707 $5,952
59,518
kWh
$3,404
254
kW-months/year
$12,716
707
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2