IAC logo
IAC Assessment: MA0814
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0814
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2020
Principal Product Plastic Injection Molded Products
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 156
Plant Area (Sq.Ft.) 90,292
Annual Production 1,500,000 Pieces
Production Hrs. Annual 6,257
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $411,572 3,582,000 kWh $0.11
Electricity Demand $66,584 9,998 kW-months/year $6.66
Electricity Fees $233 - $ -
LPG $138,019 10,291 MMBtu $13.41
TOTAL ENERGY COSTS $621,799
RECOMMENDED SAVINGS* $183,185 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,339
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$89,868
Cost:
$533,354
$89,868 781,457 - - - - $89,868
781,457
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$40,091
Cost:
$65,600
$3,785 32,909 - - $36,306 2,707 $3,785
32,909
kWh
-
-
kW-months/year
$36,306
2,707
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$33,887
Cost:
$69,625
$29,189 253,816 $4,698 705 - - $29,189
253,816
kWh
$4,698
705
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,788
Cost:
$12,100
$9,788 85,117 - - - - $9,788
85,117
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,694
Cost:
$12,100
$5,694 49,517 - - - - $5,694
49,517
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,857
Cost:
$4,096
$3,484 30,292 $373 56 - - $3,484
30,292
kWh
$373
56
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$183,185
Cost:
$696,875
$141,808 1,233,108 $5,071 761 $36,306 2,707 $141,808
1,233,108
kWh
$5,071
761
kW-months/year
$36,306
2,707
MMBtu
TOTAL IMPLEMENTED Savings:
$19,339
Cost:
$28,296
$18,966 164,926 $373 56 - - $18,966
164,926
kWh
$373
56
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand LPG Electricity Usage Electricity Demand LPG