IAC logo
IAC Assessment: MA0818
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0818
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2020
Principal Product Marine generators
NAICS 333618 - Other Engine Equipment Manufacturing
SIC 3519 - Internal Combustion Engines, Nec
Sales $10,000,000-$50,000,000
# of Employees 63
Plant Area (Sq.Ft.) 113,000
Annual Production 1,650 Pieces
Production Hrs. Annual 2,210
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $48,353 563,850 kWh $0.09
Electricity Demand $53,311 3,605 kW-months/year $14.79
Electricity Fees $11,519 - $ -
Natural Gas $50,325 5,491 MMBtu $9.16
TOTAL ENERGY COSTS $170,072
RECOMMENDED SAVINGS* $12,610 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,855
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$4,422
Cost:
$970
$344 3,996 - - $4,078 445 - - $344
3,996
kWh
-
-
kW-months/year
$4,078
445
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,320
Cost:
$9,808
$1,930 22,439 $1,390 94 - - - - $1,930
22,439
kWh
$1,390
94
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.7312 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE Savings:
$1,714
Cost:
$5,600
- - - - $1,714 187 - - -
-
kWh
-
-
kW-months/year
$1,714
187
MMBtu
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$837
Cost:
$4,000
$837 9,728 - - - - - - $837
9,728
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$789
Cost:
$1,700
- - - - - - $789 56 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$789
56
Tgal
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$782
Cost:
$2,450
$168 1,959 - - $614 67 - - $168
1,959
kWh
-
-
kW-months/year
$614
67
MMBtu
-
-
Tgal
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$746
Cost:
$500
$746 8,680 - - - - - - $746
8,680
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$12,610
Cost:
$25,028
$4,025 46,802 $1,390 94 $6,406 699 $789 56 $4,025
46,802
kWh
$1,390
94
kW-months/year
$6,406
699
MMBtu
$789
56
Tgal
TOTAL IMPLEMENTED Savings:
$4,855
Cost:
$12,008
$2,676 31,119 $1,390 94 - - $789 56 $2,676
31,119
kWh
$1,390
94
kW-months/year
-
-
MMBtu
$789
56
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal