IAC Assessment: MA0819
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0819
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2020
Principal Product Specialty paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $100,000,000-$500,000,000
# of Employees 30
Plant Area (Sq.Ft.) 230,000
Annual Production 33,000,000 Pounds
Production Hrs. Annual 8,712
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $349,388 2,373,122 kWh $0.15
Electricity Demand $158,915 29,954 kW-months/year $5.31
Electricity Fees $(-85) - $ -
Natural Gas $3,899,549 480,369 MMBtu $8.12
TOTAL ENERGY COSTS $4,407,767
RECOMMENDED SAVINGS* $74,891 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,022
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$21,315
Cost:
$92,400
$17,796 121,062 $886 167 - - $2,633 - $17,796
121,062
kWh
$886
167
kW-months/year
-
-
MMBtu
$2,633
-
Tgal
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$28,022
Cost:
$217,000
$23,825 162,076 $7,103 1,339 $(-2,906) (-358) - - $23,825
162,076
kWh
$7,103
1,339
kW-months/year
$(-2,906)
(-358)
MMBtu
-
-
Tgal
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$18,833
Cost:
$1,000
- - $18,833 3,550 - - - - -
-
kWh
$18,833
3,550
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,721
Cost:
$2,930
$6,403 43,560 $318 60 - - - - $6,403
43,560
kWh
$318
60
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$74,891
Cost:
$313,330
$48,024 326,698 $27,140 5,116 $(-2,906) (-358) $2,633 - $48,024
326,698
kWh
$27,140
5,116
kW-months/year
$(-2,906)
(-358)
MMBtu
$2,633
-
Tgal
TOTAL IMPLEMENTED Savings:
$28,022
Cost:
$217,000
$23,825 162,076 $7,103 1,339 $(-2,906) (-358) - - $23,825
162,076
kWh
$7,103
1,339
kW-months/year
$(-2,906)
(-358)
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption