IAC logo
IAC Assessment: MA0829
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0829
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2022
Principal Product plastic bags
NAICS 326111 - Plastics Bag and Pouch Manufacturing
SIC 2673 - Bags: Plastics, Laminated, & Coated
Sales $10,000,000-$50,000,000
# of Employees 88
Plant Area (Sq.Ft.) 118,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $777,034 7,679,150 kWh $0.10
Electricity Demand $102,332 13,644 kW-months/year $7.50
Electricity Fees $923 - $ -
LPG $59,246 2,957 MMBtu $20.04
TOTAL ENERGY COSTS $939,535
RECOMMENDED SAVINGS* $59,466 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,185
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Administrative Changes Electricity Usage Electricity Demand LPG Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$34,736
Cost:
$24,400
$31,406 310,951 $3,330 444 - - - - $31,406
310,951
kWh
$3,330
444
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,782
Cost:
$8,620
$6,782 67,148 - - - - - - $6,782
67,148
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,700
Cost:
$4,400
$6,700 66,340 - - - - - - $6,700
66,340
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$3,485
Cost:
$1,000
- - - - - - $3,485 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,485
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,278
Cost:
$15,850
$3,278 32,455 - - - - - - $3,278
32,455
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$2,891
Cost:
$4,445
- - - - $2,891 144 - - -
-
kWh
-
-
kW-months/year
$2,891
144
MMBtu
-
-
$
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,594
Cost:
$5,100
$1,594 15,785 - - - - - - $1,594
15,785
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$59,466
Cost:
$63,815
$49,760 492,679 $3,330 444 $2,891 144 $3,485 - $49,760
492,679
kWh
$3,330
444
kW-months/year
$2,891
144
MMBtu
$3,485
-
$
TOTAL IMPLEMENTED Savings:
$11,185
Cost:
$13,945
$8,294 82,125 - - $2,891 144 - - $8,294
82,125
kWh
-
-
kW-months/year
$2,891
144
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG Administrative Changes Electricity Usage Electricity Demand LPG Administrative Changes