Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2022 |
Principal Product | Baked Goods and Bread |
NAICS | 311811 - Retail Bakeries |
SIC | 2051 - Bread, Cake, And Related Products |
Sales | $50,000,000-$100,000,000 |
# of Employees | 135 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 70,097,178 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | ME |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $431,022 | 6,081,703 | kWh | $0.07 |
Electricity Demand | $191,154 | 11,321 | kW-months/year | $16.88 |
Electricity Fees | $1,442 | - | $ | - |
Natural Gas | $515,463 | 53,770 | MMBtu | $9.59 |
TOTAL ENERGY COSTS | $1,168,740 | |||
RECOMMENDED SAVINGS* | $59,333 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,356 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $16,115 Cost: $39,510 |
- | - | - | - | $16,115 | 1,681 |
- - kWh |
- - kW-months/year |
$16,115 1,681 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,598 Cost: $34,642 |
$(-2,981) | (-41,981) | $(-946) | (-56) | $13,525 | 1,411 |
$(-2,981) (-41,981) kWh |
$(-946) (-56) kW-months/year |
$13,525 1,411 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $9,895 Cost: $23,950 |
$7,464 | 105,120 | $2,431 | 144 | - | - |
$7,464 105,120 kWh |
$2,431 144 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $6,264 Cost: $875 |
$4,727 | 66,576 | $1,537 | 91 | - | - |
$4,727 66,576 kWh |
$1,537 91 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $5,531 Cost: $1,500 |
- | - | - | - | $5,531 | 577 |
- - kWh |
- - kW-months/year |
$5,531 577 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE |
Savings: $7,372 Cost: $500 |
- | - | - | - | $7,372 | 769 |
- - kWh |
- - kW-months/year |
$7,372 769 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING |
Savings: $2,777 Cost: $7,150 |
$2,169 | 30,556 | $608 | 36 | - | - |
$2,169 30,556 kWh |
$608 36 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,781 Cost: $625 |
$1,343 | 18,922 | $438 | 26 | - | - |
$1,343 18,922 kWh |
$438 26 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $59,333 Cost: $108,752 |
$12,722 | 179,193 | $4,068 | 241 | $42,543 | 4,438 | $12,722 179,193 kWh |
$4,068 241 kW-months/year |
$42,543 4,438 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,356 Cost: $33,725 |
$10,976 | 154,598 | $3,477 | 206 | $12,903 | 1,346 | $10,976 154,598 kWh |
$3,477 206 kW-months/year |
$12,903 1,346 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |