IAC logo
IAC Assessment: MA0839
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0839
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2022
Principal Product Specialty lubricants
NAICS 324191 - Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992 - Lubricating Oils And Greases
Sales $1,000,000-$5,000,000
# of Employees 28
Plant Area (Sq.Ft.) 54,000
Annual Production 1,800 Tons
Production Hrs. Annual 4,290
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,393 971,800 kWh $0.10
Electricity Demand $51,294 2,842 kW-months/year $18.05
Electricity Fees $4,473 - $ -
Natural Gas $12,697 1,342 MMBtu $9.46
TOTAL ENERGY COSTS $163,857
RECOMMENDED SAVINGS* $96,543 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,880
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$88,663
Cost:
$1,287,855
$88,663 904,725 - - - - $88,663
904,725
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$2,763
Cost:
$3,268
- - - - $2,763 292 -
-
kWh
-
-
kW-months/year
$2,763
292
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,751
Cost:
$13,391
$3,794 38,712 $957 53 - - $3,794
38,712
kWh
$957
53
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$366
Cost:
$2,775
$294 3,002 $72 4 - - $294
3,002
kWh
$72
4
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$96,543
Cost:
$1,307,289
$92,751 946,439 $1,029 57 $2,763 292 $92,751
946,439
kWh
$1,029
57
kW-months/year
$2,763
292
MMBtu
TOTAL IMPLEMENTED Savings:
$7,880
Cost:
$19,434
$4,088 41,714 $1,029 57 $2,763 292 $4,088
41,714
kWh
$1,029
57
kW-months/year
$2,763
292
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas