IAC Assessment: MA0844
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0844
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2022
Principal Product Metal finishing, powder coating, anodizing and plating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 120,000
Annual Production 15,000 Units
Production Hrs. Annual 2,210
Location (State) RI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,916 794,400 kWh $0.12
Electricity Demand $68,127 5,339 kW-months/year $12.76
Electricity Fees $2,533 - $ -
Natural Gas $109,478 11,283 MMBtu $9.70
TOTAL ENERGY COSTS $277,764
RECOMMENDED SAVINGS* $21,395 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,466
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$9,380
Cost:
$10,000
$1,359 11,748 $9,021 707 - - $(-1,000) - $1,359
11,748
kWh
$9,021
707
kW-months/year
-
-
MMBtu
$(-1,000)
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,525
Cost:
$7,135
- - $5,525 433 - - - - -
-
kWh
$5,525
433
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,466
Cost:
$23,175
$3,879 33,525 $587 46 - - - - $3,879
33,525
kWh
$587
46
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$853
Cost:
$4,200
- - - - $853 90 - - -
-
kWh
-
-
kW-months/year
$853
90
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$597
Cost:
$895
- - - - $597 63 - - -
-
kWh
-
-
kW-months/year
$597
63
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$574
Cost:
$2,100
$574 4,961 - - - - - - $574
4,961
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$21,395
Cost:
$47,505
$5,812 50,234 $15,133 1,186 $1,450 153 $(-1,000) - $5,812
50,234
kWh
$15,133
1,186
kW-months/year
$1,450
153
MMBtu
$(-1,000)
-
$
TOTAL IMPLEMENTED Savings:
$4,466
Cost:
$23,175
$3,879 33,525 $587 46 - - - - $3,879
33,525
kWh
$587
46
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes