IAC logo
IAC Assessment: MA0852
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0852
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2023
Principal Product Waste water treatment
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $50,000,000-$100,000,000
# of Employees 20
Plant Area (Sq.Ft.) 1,500,000
Annual Production 10,950,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,179,109 17,214,525 kWh $0.13
Electricity Demand $212,467 27,280 kW-months/year $7.79
Electricity Fees $(-7,739) - $ -
Natural Gas $609,360 98,546 MMBtu $6.18
Other Energy $24,598 826 MMBtu $29.78
TOTAL ENERGY COSTS $3,017,795
RECOMMENDED SAVINGS* $197,961 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $100,956
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$99,365
Cost:
$854,943
$45,203 355,933 $13,813 1,774 - - - - $40,349 - $45,203
355,933
kWh
$13,813
1,774
kW-months/year
-
-
MMBtu
-
-
MMBtu
$40,349
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$35,986
Cost:
$16,136
$33,198 261,398 $2,788 358 - - - - - - $33,198
261,398
kWh
$2,788
358
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$22,824
Cost:
$33,749
$(-8,900) (-70,080) $(-748) (-96) $32,472 5,251 - - - - $(-8,900)
(-70,080)
kWh
$(-748)
(-96)
kW-months/year
$32,472
5,251
MMBtu
-
-
MMBtu
-
-
$
04: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$20,149
Cost:
$203,280
$27,813 219,000 $2,336 300 - - - - $(-10,000) - $27,813
219,000
kWh
$2,336
300
kW-months/year
-
-
MMBtu
-
-
MMBtu
$(-10,000)
-
$
05: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$10,205
Cost:
$546,530
$(-10,298) (-81,087) - - - - $20,503 689 - - $(-10,298)
(-81,087)
kWh
-
-
kW-months/year
-
-
MMBtu
$20,503
689
MMBtu
-
-
$
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,244
Cost:
$1,866
$4,839 38,106 $405 52 - - - - - - $4,839
38,106
kWh
$405
52
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,597
Cost:
$875
$482 3,796 - - $2,115 342 - - - - $482
3,796
kWh
-
-
kW-months/year
$2,115
342
MMBtu
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,591
Cost:
$1,544
$1,467 11,549 $124 16 - - - - - - $1,467
11,549
kWh
$124
16
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$197,961
Cost:
$1,658,923
$93,804 738,615 $18,718 2,404 $34,587 5,593 $20,503 689 $30,349 - $93,804
738,615
kWh
$18,718
2,404
kW-months/year
$34,587
5,593
MMBtu
$20,503
689
MMBtu
$30,349
-
$
TOTAL IMPLEMENTED Savings:
$100,956
Cost:
$856,487
$46,670 367,482 $13,937 1,790 - - - - $40,349 - $46,670
367,482
kWh
$13,937
1,790
kW-months/year
-
-
MMBtu
-
-
MMBtu
$40,349
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Energy Administrative Changes