IAC Assessment: MA0855
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0855
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2023
Principal Product Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $5,000,000-$10,000,000
# of Employees 10
Plant Area (Sq.Ft.) 27,400
Annual Production 797,766 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $181,429 1,231,400 kWh $0.15
Electricity Demand $21,601 2,501 kW-months/year $8.64
Electricity Fees $3,591 - $ -
Natural Gas $31,582 1,987 MMBtu $15.89
TOTAL ENERGY COSTS $238,203
RECOMMENDED SAVINGS* $80,838 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$63,886
Cost:
$285,949
$43,063 292,950 $173 20 $20,650 - - - $43,063
292,950
kWh
$173
20
kW-months/year
$20,650
-
$
-
-
MMBtu
02: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$3,299
Cost:
$22,900
$(-25,855) (-175,887) $(-2,427) (-281) - - $31,581 1,987 $(-25,855)
(-175,887)
kWh
$(-2,427)
(-281)
kW-months/year
-
-
$
$31,581
1,987
MMBtu
03: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$10,616
Cost:
$23,709
$9,528 64,824 $1,088 126 - - - - $9,528
64,824
kWh
$1,088
126
kW-months/year
-
-
$
-
-
MMBtu
04: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,302
Cost:
$900
$1,302 8,856 - - - - - - $1,302
8,856
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$747
Cost:
$550
- - - - - - $747 47 -
-
kWh
-
-
kW-months/year
-
-
$
$747
47
MMBtu
06: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$988
Cost:
$385
$914 6,221 $74 9 - - - - $914
6,221
kWh
$74
9
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$80,838
Cost:
$334,393
$28,952 196,964 $(-1,092) (-126) $20,650 - $32,328 2,034 $28,952
196,964
kWh
$(-1,092)
(-126)
kW-months/year
$20,650
-
$
$32,328
2,034
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas