IAC logo
IAC Assessment: MA0856
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0856
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2023
Principal Product Water
NAICS 221310 - Water Supply and Irrigation Systems
SIC 4941 - Water Supply
Sales $1,000,000-$5,000,000
# of Employees 10
Plant Area (Sq.Ft.) 11,300
Annual Production 334,869 Thousand Gallons
Production Hrs. Annual 3,600
Location (State) MA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,308 614,700 kWh $0.15
Electricity Demand $16,354 1,894 kW-months/year $8.63
Electricity Fees $2,984 - $ -
Natural Gas $9,830 596 MMBtu $16.49
TOTAL ENERGY COSTS $122,476
RECOMMENDED SAVINGS* $59,284 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$47,289
Cost:
$222,915
$31,776 209,052 $691 80 $14,822 - $31,776
209,052
kWh
$691
80
kW-months/year
$14,822
-
$
02: 2.6124 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE Savings:
$7,517
Cost:
$23,709
$6,999 46,063 $518 60 - - $6,999
46,063
kWh
$518
60
kW-months/year
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$859
Cost:
$900
$859 5,653 - - - - $859
5,653
kWh
-
-
kW-months/year
-
-
$
04: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$2,528
Cost:
$1,450
$2,346 15,433 $182 21 - - $2,346
15,433
kWh
$182
21
kW-months/year
-
-
$
05: 2.7234 USE HEAT PUMP FOR SPACE CONDITIONING Savings:
$1,091
Cost:
$385
$1,014 6,674 $77 9 - - $1,014
6,674
kWh
$77
9
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$59,284
Cost:
$249,359
$42,994 282,875 $1,468 170 $14,822 - $42,994
282,875
kWh
$1,468
170
kW-months/year
$14,822
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees