Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Massachusetts |
---|---|
Assessment Year | 2012 |
Principal Product | Rubber Shaft Seals |
NAICS | 339991 - Gasket, Packing, and Sealing Device Manufacturing |
SIC | 3053 - Gaskets, Packing And Sealing Devices |
Sales | $50,000,000-$100,000,000 |
# of Employees | 409 |
Plant Area (Sq.Ft.) | 290,000 |
Annual Production | 365,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | NH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,361,923 | 15,704,834 | kWh | $0.09 |
Electricity Demand | $333,063 | 33,311 | kW-months/year | $10.00 |
Fuel Oil #6 | $685,242 | 44,116 | MMBtu | $15.53 |
Other Gas | $281,188 | 16,131 | MMBtu | $17.43 |
TOTAL ENERGY COSTS | $2,661,416 | |||
RECOMMENDED SAVINGS* | $173,139 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $16,550 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #6 | Administrative Changes | Electricity Usage | Electricity Demand | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $99,334 Cost: $216,000 |
$(-29,800) | (-345,310) | $(-4,900) | (-490) | $134,034 | 8,629 | - | - |
$(-29,800) (-345,310) kWh |
$(-4,900) (-490) kW-months/year |
$134,034 8,629 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $36,978 Cost: $9,000 |
$36,978 | 428,480 | - | - | - | - | - | - |
$36,978 428,480 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $18,123 Cost: $77,100 |
$3,123 | 36,192 | - | - | - | - | $15,000 | - |
$3,123 36,192 kWh |
- - kW-months/year |
- - MMBtu |
$15,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,077 Cost: $8,000 |
$8,077 | 93,600 | - | - | - | - | - | - |
$8,077 93,600 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $4,883 Cost: $3,120 |
$4,883 | 56,576 | - | - | - | - | - | - |
$4,883 56,576 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION |
Savings: $3,590 Cost: $3,120 |
$3,590 | 41,600 | - | - | - | - | - | - |
$3,590 41,600 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $2,154 Cost: $2,000 |
$2,154 | 24,960 | - | - | - | - | - | - |
$2,154 24,960 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $173,139 Cost: $318,340 |
$29,005 | 336,098 | $(-4,900) | (-490) | $134,034 | 8,629 | $15,000 | - | $29,005 336,098 kWh |
$(-4,900) (-490) kW-months/year |
$134,034 8,629 MMBtu |
$15,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $16,550 Cost: $14,240 |
$16,550 | 191,776 | - | - | - | - | - | - | $16,550 191,776 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #6 | Administrative Changes | Electricity Usage | Electricity Demand | Fuel Oil #6 | Administrative Changes |