IAC logo
IAC Assessment: MAS021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MAS021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product Rubber Shaft Seals
NAICS 339991 - Gasket, Packing, and Sealing Device Manufacturing
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $50,000,000-$100,000,000
# of Employees 409
Plant Area (Sq.Ft.) 290,000
Annual Production 365,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) NH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,361,923 15,704,834 kWh $0.09
Electricity Demand $333,063 33,311 kW-months/year $10.00
Fuel Oil #6 $685,242 44,116 MMBtu $15.53
Other Gas $281,188 16,131 MMBtu $17.43
TOTAL ENERGY COSTS $2,661,416
RECOMMENDED SAVINGS* $173,139 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,550
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 Administrative Changes Electricity Usage Electricity Demand Fuel Oil #6 Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$99,334
Cost:
$216,000
$(-29,800) (-345,310) $(-4,900) (-490) $134,034 8,629 - - $(-29,800)
(-345,310)
kWh
$(-4,900)
(-490)
kW-months/year
$134,034
8,629
MMBtu
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$36,978
Cost:
$9,000
$36,978 428,480 - - - - - - $36,978
428,480
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$18,123
Cost:
$77,100
$3,123 36,192 - - - - $15,000 - $3,123
36,192
kWh
-
-
kW-months/year
-
-
MMBtu
$15,000
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,077
Cost:
$8,000
$8,077 93,600 - - - - - - $8,077
93,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$4,883
Cost:
$3,120
$4,883 56,576 - - - - - - $4,883
56,576
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$3,590
Cost:
$3,120
$3,590 41,600 - - - - - - $3,590
41,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$2,154
Cost:
$2,000
$2,154 24,960 - - - - - - $2,154
24,960
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$173,139
Cost:
$318,340
$29,005 336,098 $(-4,900) (-490) $134,034 8,629 $15,000 - $29,005
336,098
kWh
$(-4,900)
(-490)
kW-months/year
$134,034
8,629
MMBtu
$15,000
-
$
TOTAL IMPLEMENTED Savings:
$16,550
Cost:
$14,240
$16,550 191,776 - - - - - - $16,550
191,776
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $