IAC logo
IAC Assessment: MAS025
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MAS025
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 2012
Principal Product Printed Circuit Boards
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 210
Plant Area (Sq.Ft.) 110,000
Annual Production 2,628 Thousand Feet
Production Hrs. Annual 8,500
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $496,462 6,349,440 kWh $0.08
Electricity Demand $167,190 15,535 kW-months/year $10.76
Electricity Fees $9,000 - $ -
LPG $3,911 123 MMBtu $31.80
Fuel Oil #4 $476,102 19,309 MMBtu $24.66
TOTAL ENERGY COSTS $1,152,665
RECOMMENDED SAVINGS* $78,696 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,171
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #4 Electricity Usage Fuel Oil #4
$ kWh $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$50,701
Cost:
$22,000
- - $50,701 2,056 -
-
kWh
$50,701
2,056
MMBtu
02: 2.7314 REDUCE VENTILATION AIR Savings:
$11,105
Cost:
$10,770
$2,597 33,212 $8,508 345 $2,597
33,212
kWh
$8,508
345
MMBtu
03: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,097
Cost:
-
$7,097 90,750 - - $7,097
90,750
kWh
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,622
Cost:
$935
- - $5,622 228 -
-
kWh
$5,622
228
MMBtu
05: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$4,171
Cost:
$4,300
$4,171 53,338 - - $4,171
53,338
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$78,696
Cost:
$38,005
$13,865 177,300 $64,831 2,629 $13,865
177,300
kWh
$64,831
2,629
MMBtu
TOTAL IMPLEMENTED Savings:
$4,171
Cost:
$4,300
$4,171 53,338 - - $4,171
53,338
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu