IAC Assessment: ME0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: ME0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Maine
Assessment Year 1994
Principal Product Finished Leather
NAICS n/a
SIC 2386 - Leather And Sheep-lined Clothing
Sales $1,000,000-$5,000,000
# of Employees 100
Plant Area (Sq.Ft.) 30,000
Annual Production 3,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) ME
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,310 1,671,747 kWh $0.08
Fuel Oil #6 $57,490 21,842 MMBtu $2.63
TOTAL ENERGY COSTS $194,800
RECOMMENDED SAVINGS* $10,124 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,124
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,570
Cost:
$4,500
$1,570 - - - - - $1,570
-
kWh
-
-
MMBtu
-
-
$
02: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$446
Cost:
$450
- - $446 170 - - -
-
kWh
$446
170
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,124
Cost:
$800
$1,124 13,775 - - - - $1,124
13,775
kWh
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,005
Cost:
$14,689
$5,005 60,961 - - - - $5,005
60,961
kWh
-
-
MMBtu
-
-
$
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,979
Cost:
-
- - - - $1,979 - -
-
kWh
-
-
MMBtu
$1,979
-
$
TOTAL RECOMMENDED Savings:
$10,124
Cost:
$20,439
$7,699 74,736 $446 170 $1,979 - $7,699
74,736
kWh
$446
170
MMBtu
$1,979
-
$
TOTAL IMPLEMENTED Savings:
$1,124
Cost:
$800
$1,124 13,775 - - - - $1,124
13,775
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes